Commissioning
CNGmass DCI
40
Hauser
6
Commissioning
6.1
Function check
Make sure that all the final checks have been completed before commissioning the measuring point:
• Checklist for "Post-installation check"
• Checklist for "Post-connection check"
6.2
Switching on the measuring device
If the post-connection checks have been performed, the supply voltage can be switched on. The
device is now operational.
The measuring device performs a number of power on self-tests. As this procedure progresses the
following sequence of messages appears on the local display:
Normal measuring mode commences as soon as startup completes.
Various measured value and/or status variables appear on the display (HOME position).
!
Note!
If startup fails, an error message indicating the cause is displayed.
CNGmass DCI
START-UP
RUNNING
Startup message
Æ
CNGmass DCI
DEVICE SOFTWARE
V XX.XX.XX
Current software version
Æ
CURRENT OUTPUT
FREQUENCY OUTPUT 1
FREQUENCY OUTPUT 2
STATUS INPUT
List of installed input/output modules
Æ
C.T.
YES/NO
Æ
SYSTEM OK
→
OPERATION
Beginning of normal measuring mode
Æ