Installation
Hauser
9
3.3
Installation instructions
Preferably mount the cleaning unit close to the measuring point.
a0011385
Fig. 3: Cleaning unit on tubular frame supplied
1
Cleaning unit
2
Tubular frame (mounted at factory)
3
Screws for securing to floor (not part of scope of delivery)
You have the following installation options:
1.
Secure the unit mounted on the tubular frame to the floor (
The required fastening material does not form part of the scope of delivery!
2.
Position the unit mounted on the tubular frame on the railing or an upright post and secure the
tubular frame to the railing/post with a hose clip (not supplied).
3.4
Post-installation check
• After mounting, check all the connections to ensure they are secure and leak-tight.
• Check all cables and hoses for damage.
• Check whether the cables are routed such that they are free from electromagnetic interference
influences.