Installation
Liquiline System CA80PH
24
Hauser
5.1.6
Mounting location
Note the following when mounting the device:
• Make sure that the wall has sufficient load-bearing capacity.
• Mount the device on a level surface (with additional base).
• Protect the device from additional heating (e.g. from heaters).
• Protect the device from mechanical vibrations.
• Make sure that the fluid can drain freely without any siphoning effects.
• Make sure air can circulate freely on the front of the housing.
5.1.7
Mechanical connection
Connecting the liquid-bearing suction lines
First connect the liquid-bearing suction lines and visually inspect the hoses before
establishing the connection to the power supply. It is possible that both the sample
preparation and the analyzer will start directly and supply sample into the device.
The reagents used can be detrimental to health. Pay attention to the information in the
reagent safety data sheets.
Self-priming
Connect the intake hose supplied (1.5 m) to the liquid manager to ("sample") (see hose
connection diagram), and guide the hose through the analyzer's hose gland to the outside.
Ensure that only sample that is low in solids is supplied, as otherwise there is a risk of
blockage. The customer must guarantee a constant and sufficient volume of sample.
Summary of Contents for Liquiline System CA80PH
Page 2: ......
Page 208: ...www addresses endress com ...