Micropilot M FMR 240 with Foundation Fieldbus
Commissioning
E Hauser
59
6
Commissioning
6.1
Function check
Make sure that all final checks have been completed before you start up your measuring point:
• Checklist “Post installation check” (see Page 27).
• Checklist “Post connection check” (see Page 31).
6.2
Switching on the measuring device
When the instrument is switched on for the first time, the following messages appear on the display:
⇒
⇓
After 5 s, the following message appears
⇓
After 5 s or after you have pressed
F
the following
message appears
Select the language (this message appears the first time
the instrument is switched on)
⇓
Select the basic unit (this message appears the first time
the instrument is switched on)
⇓
The current measured value is displayed
⇓
After
F
is pressed, you reach the group selection.
This selection enables you to perform the basic setup
E HAUSER
E
+
–