3 Installation
Proline Promass 83 FOUNDATION Fieldbus
22
Hauser
Installation in control panel
1.
Prepare the opening in the panel (Fig. 13).
2.
Slide the housing into the opening in the panel from the front.
3.
Screw the fasteners onto the wall-mount housing.
4.
Place the threaded rods in the fasteners and screw them down until the housing is seated
tightly against the panel. Afterwards, tighten the locking nuts. Additional support is not neces-
sary.
a0001131
Fig. 13:
Panel Installation (wall-mount housing)
Pipe mounting
The assembly should be performed by following the instructions in Fig. 14.
"
Caution!
If the device is mounted to a warm pipe, make certain that the housing temperature does not exceed
+60 °C, which is the maximum permissible temperature.
a0001132
Fig. 14:
Pipe mounting (wall-mount housing)
245
~1
10
+0.5 –
0.5
210
+0.5
– 0
.5
Ø
20...70
~155
Summary of Contents for Proline Promass 83
Page 24: ...3 Installation Proline Promass 83 FOUNDATION Fieldbus 24 Endress Hauser ...
Page 34: ...4 Wiring Proline Promass 83 FOUNDATION Fieldbus 34 Endress Hauser ...
Page 64: ...6 Commissioning Proline Promass 83 FOUNDATION Fieldbus 64 Endress Hauser ...
Page 66: ...7 Maintenance Proline Promass 83 FOUNDATION Fieldbus 66 Endress Hauser ...
Page 90: ...9 Trouble shooting Proline Promass 83 FOUNDATION Fieldbus 90 Endress Hauser ...
Page 116: ...Index Proline Promass 83 FOUNDATION Fieldbus 116 Endress Hauser ...
Page 118: ...www endress com worldwide BA065D 06 en 12 04 50098623 FM SGML 6 0 ...