Proline Promass 83 FOUNDATION Fieldbus
3 Installation
Hauser
23
3.3.3
Turning the local display
1.
Remove the cover of the electronics compartment.
2.
Press the side latches on the display module and remove it from the electronics compartment
cover plate.
3.
Rotate the display to the desired position (max. 4 x 45 ° in both directions), and reset it onto
the electronics compartment cover plate.
4.
Screw the cover of the electronics compartment firmly onto the transmitter housing.
A0001892
Fig. 15:
Turning the local display (field housing)
3.4
Post installation check
Perform the following checks after installing the measuring device in the pipe:
Device condition and specifications
Notes
Is the device damaged (visual inspection)?
−
Does the device correspond to specifications at the measuring point, including
process temperature and pressure, ambient temperature, measuring range, etc.?
Installation
Notes
Does the arrow on the sensor nameplate match the direction of flow through the
pipe?
−
Are the measuring point number and labeling correct (visual inspection)?
–
Is the orientation chosen for the sensor correct, in other words suitable for sensor
type, fluid properties (outgassing, with entrained solids) and fluid temperature?
Process environment / process conditions
Notes
Is the measuring device protected against moisture and direct sunlight?
−
4 x 45°
Summary of Contents for Proline Promass 83
Page 24: ...3 Installation Proline Promass 83 FOUNDATION Fieldbus 24 Endress Hauser ...
Page 34: ...4 Wiring Proline Promass 83 FOUNDATION Fieldbus 34 Endress Hauser ...
Page 64: ...6 Commissioning Proline Promass 83 FOUNDATION Fieldbus 64 Endress Hauser ...
Page 66: ...7 Maintenance Proline Promass 83 FOUNDATION Fieldbus 66 Endress Hauser ...
Page 90: ...9 Trouble shooting Proline Promass 83 FOUNDATION Fieldbus 90 Endress Hauser ...
Page 116: ...Index Proline Promass 83 FOUNDATION Fieldbus 116 Endress Hauser ...
Page 118: ...www endress com worldwide BA065D 06 en 12 04 50098623 FM SGML 6 0 ...