10 Technical data
Proline Promass 83 FOUNDATION Fieldbus
96
Hauser
10.1.6
Performance characteristics
Reference operating
conditions
Error limits following ISO/DIS 11631:
• 20...30 °C; 2...4 bar
• Calibration systems as per national norms
• Zero point calibrated under operating conditions
• Field density calibrated (or special density calibration)
Maximum measured error
Mass flow (liquid)
Promass F, M, A: ±0.10% ± [(zero point stability / measured value) x 100]% o.r.
Promass E: ±0.30% ± [(zero point stability / measured value) x 100]% o.r.
Promass H, I: ±0.125% ± [(zero point stability / measured value) x 100]% o.r.
Mass flow (gas)
Promass F: ±0.35% ± [(zero point stability / measured value) x 100]% o.r.
Promass M, A, I: ±0.50% ± [(zero point stability / measured value) x 100]% o.r.
Promass E: ±0.75% ± [(zero point stability / measured value) x 100]% o.r.
Volume flow (liquid)
Promass F: ±0.15% ± [(zero point stability / measured value) x 100]% o.r.
Promass M, A: ±0.25% ± [(zero point stability / measured value) x 100]% o.r.
Promass E: ±0.45% ± [(zero point stability / measured value) x 100]% o.r.
Promass H, I: ±0.50% ± [(zero point stability / measured value) x 100]% o.r.
o.r. = of reading
Zero point stability (Promass F, M, E):
Zero point stability (Promass A):
DN
Max.
full scale
value
[kg/h] or [l/h]
Zero point stability
Promass F
[kg/h] or [l/h]
Zero point stability
Promass F
(high-temperature
version)
[kg/h] or [l/h]
Zero point stability
Promass M
[kg/h] or [l/h]
Zero point stability
Promass E
[kg/h] or [l/h]
8
2000
0.060
–
0.100
0.200
15
6500
0.200
–
0.325
0.650
25
18000
0.540
1.80
0.90
1.80
40
45000
2.25
–
2.25
4.50
50
70000
3.50
7.00
3.50
7.00
80
180000
9.00
18.00
9.00
–
100
350000
14.00
–
–
–
150
800000
32.00
–
–
–
250
2200000
88.00
-
-
250
DN
Maximum full scale value
[kg/h] or [l/h]
Zero point stability
[kg/h] or [l/h]
1
20
0.0010
2
100
0.0050
4
450
0.0225
Summary of Contents for Proline Promass 83
Page 24: ...3 Installation Proline Promass 83 FOUNDATION Fieldbus 24 Endress Hauser ...
Page 34: ...4 Wiring Proline Promass 83 FOUNDATION Fieldbus 34 Endress Hauser ...
Page 64: ...6 Commissioning Proline Promass 83 FOUNDATION Fieldbus 64 Endress Hauser ...
Page 66: ...7 Maintenance Proline Promass 83 FOUNDATION Fieldbus 66 Endress Hauser ...
Page 90: ...9 Trouble shooting Proline Promass 83 FOUNDATION Fieldbus 90 Endress Hauser ...
Page 116: ...Index Proline Promass 83 FOUNDATION Fieldbus 116 Endress Hauser ...
Page 118: ...www endress com worldwide BA065D 06 en 12 04 50098623 FM SGML 6 0 ...