22. System configuration/connection of function blocks (Fig. 29):
A concluding “overall system configuration” is essential so that the operating mode of the Ana-
log Input Function Block can be set to AUTO and so that the field device is integrated into the
system application.
To do this, configuration software such as the NI-FBUS Configurator from National Instru-
ments is used to connect the function blocks to the desired control strategy - generally graphi-
cally - and then the sequence of the individual process control functions is specified.
F06-xxxFFxxx-20-xx-xx-xx-000
Fig. 29:
Connecting function blocks using the NI-FBUS Configurator
23. After specifying the active LAS, download all the data and parameters into the field device.
24. Set the operating mode in the parameter group MODE_BLK (parameter TARGET) to AUTO.
However, this is only possible if two conditions are met:
– The function blocks are correctly connected with each other.
– The Resource Block is in operating mode AUTO.
Summary of Contents for Proline Promass 83
Page 24: ...3 Installation Proline Promass 83 FOUNDATION Fieldbus 24 Endress Hauser ...
Page 34: ...4 Wiring Proline Promass 83 FOUNDATION Fieldbus 34 Endress Hauser ...
Page 64: ...6 Commissioning Proline Promass 83 FOUNDATION Fieldbus 64 Endress Hauser ...
Page 66: ...7 Maintenance Proline Promass 83 FOUNDATION Fieldbus 66 Endress Hauser ...
Page 90: ...9 Trouble shooting Proline Promass 83 FOUNDATION Fieldbus 90 Endress Hauser ...
Page 116: ...Index Proline Promass 83 FOUNDATION Fieldbus 116 Endress Hauser ...
Page 118: ...www endress com worldwide BA065D 06 en 12 04 50098623 FM SGML 6 0 ...