Prosonic M FMU44 HART
Commissioning
Hauser
25
9
Commissioning
The Commissioning section contains the following steps:
• Function check
• Switching on the measuring device
• Establishing a connection via Fieldcare
• Configuring the measuring device
• Displaying the envelope curve
9.1
Function check
9.1.1
Post-mounting check
Is the device free from damage (visual inspection)?
Does the measuring device comply with the measuring point specifications?
After aligning the housing: is the process seal on the nozzle or flange free from
damage?
For example:
• Supply voltage
• Ambient temperature
• Process temperature
• Process pressure
• Ambient temperature range
• Measuring range
Are the measuring point number and labeling correct (visual inspection)?
Is the measuring device adequately protected against precipitation and direct sunlight?
9.1.2
Post-connection check
Are the device or cables undamaged (visual inspection)?
Do the mounted cables have adequate strain relief?
Does the supply voltage match the specifications on the nameplate?
No reverse polarity, terminal assignment correct?
Do the cables used comply with the requirements?
Are the cable glands tightened correctly?
Is the cable gland leak-tight?
Is the housing cover screwed down?
If required: Has the protective ground connection been established?
If supply voltage is present, is the device operational and does a screen appear?
9.2
Switching on the measuring device
After the supply voltage has been switched on, the device is first initialized. Then the
following information appears for approximately five seconds:
• Device type
• Software version