7
A s s e m b l y I n s t r u c t i o n s
Assembly of the ESB150 takes professional installers
about 1 hour to complete.
Professional installers are highly recommended!
If this is the first time you have assembled this type of equipment, plan on significantly more time. How-
ever, if you acquire the appropriate tools, obtain assistance, and follow the assembly steps sequentially,
the process will take time, but is fairly easy.
Assembly Tips
Read all “Notes” on each page before beginning each
step.
While you may be able to assemble the ESB150 using
the illustrations only, important safety notes and oth-
er tips are included in the text.
Some pieces may have extra holes that you will not
use. Use only those holes indicated in the instruc-
tions and illustrations.
IMPORTANT!
Before you begin you should look at the quick refer-
ence guide that shows all hardware parts (in actual
size) along with the corresponding component num-
bers in the assembly instructions.
To find out the length of a particular bolt, measure its
shank (the long, narrow part beneath the head) using
the ruler below. Refer to the following diagram:
Summary of Contents for ESB150
Page 9: ...9 S T E P 1 Above shows Step 1 assembled and completed F 33 34 E A 33 34...
Page 11: ...11 S T E P 2 Above shows Step 2 assembled and completed 31 A 29 28 30...
Page 13: ...13 S T E P 3 Above shows Step 3 assembled and completed B 8 A...
Page 15: ...15 S T E P 4 Above shows Step 4 assembled and completed B D 75 74...
Page 17: ...17 S T E P 5 Above shows Step 5 assembled and completed C 8 A...
Page 19: ...19 S T E P 6 Above shows Step 6 assembled and completed G 70 70 7 G 7 75 74 C...
Page 29: ...29 N o t e s...