17
www.enelx.com
Phone: +1-844-584-2329
EXPLODED VIEW
Service
Cover
Service
Hatch
FRONT VIEW
The Service Hatch has an attached
gasket. Ensure this is carefully stored to
avoid damage or accumulation of debris.
6. Pre-installation power up
The JuicePump is shipped with a tem
-
porary single phase power cable which
allows the unit to be powered prior to
installation. This is attached to the M40
blanking plug. This allows for software
updates, charger configuration and/or 4G
connectivity testing.
The cable has a male IEC socket and an
IEC female lead is required to supply
power.
If pre installation power up is required
contact your supplier to synchronize with
Enel X.
7. Remove IEC cable wiring
Remove the M40 blanking plug and IEC
cable wiring from the switch gear.
4. Disconnect front panel
There are three points to disconnect:
1. Wiring to the top rear panel.
Squeeze the connector to disconnect.
2. Earthing strap.
Unscrew the nut on the metalwork with
a 10mm socket. Remove the nut and
earthing strap lug from the stud.
3. Connector ‘B’ on the HMI panel.
Connector ‘B’ detaches by squeezing the
connector front and rear with your fingers
and pulling down.
1
2
3
5. Remove service covers
Remove the service hatch and cover to
access the internal enclosure to prepare
the JuicePump for wiring. Use an 8mm
socket and 2.5mm hex bits.
Installation