10
EG-PMS-LANU ENERGENIE PROGRAMMABLE POWER
STRIP WITH LAN INTERFACE
All brands and logos are registered trademarks of their respective owners
3. Installation
It is strongly recommended to avoid damp or wet places for
installation.
3.1. Getting started
Connect EG-PMS-LANU to the wall socket first and then to the LAN
socket (or your computer LAN card) with the provided patch cord or
vice-versa.
EG-PMS-LANU can now be switched on and off by means of the
Main rocker switch (Z)
.
One socket
E
of EG-PMS-LANU is non manageable. This socket is
switched on and off by means of the
Main rocker switch (Z)
and
cannot be managed by the computer – so it’s called
non-
manageable socket
in this manual.
If EG-PMS-LANU is switched on then the red indicator on the rocker
switch
POWER
is lit.
The sockets: Socket A, B, C, D can be managed or pre-programmed
by computer via LAN. They are called
manageable sockets
in this
manual.
The manageable sockets of EG-PMS-LANU can be programmed to
be on or off. The current status of each manageable socket is