background image

Introduction

Safety regulations

 

The operator of the photovoltaic module is responsible for 

compliance with all relevant legal regulations and guidelines. 

Please commission, operate or maintain the photovoltaic 
modules only in accordance with the following regulations 
and standards: 

»

  Installation instructions;

»

  Applicable documents (country-specific regulations on 

      pressure equipment, operational safety, hazardous goods 
      and environmental protection);

»

  Plant-specific regulations and requirements; 

»

  Applicable country-specific laws, regulations and rules for 

   planning, installing and operating solar power systems 
      and for working on the roof; 

»

   Valid international, national and regional regulations, in

      particular for the installation of electrical devices and 
      systems, for working with direct current and regulations 
      of the responsible electricity provider for the parallel 
      operation of solar power systems; 

»

  Accident prevention regulations and

»

  other applicable standards and generally recognized

      codes of practice. 

Staff qualifications

Operators or installers are responsible for ensuring that 
installation, maintenance, commissioning and dismantling 
are only carried out by trained specialists with recognized 
training certificates (from the respective state or federal 
organizations) for the respective specialist area. 

All electrical work may only be carried out by an officially 

certified specialist in accordance with the applicable 
standards, VDE regulations, accident prevention regulations 
and the regulations of the local electricity company.

Validity

These instructions only apply to PV modules from Energetica 

Industries GmbH. Energetica Industries GmbH assumes no 
liability for damage resulting from failure to observe these 
instructions. 

It is the responsibility of the system installer to observe the 
wiring and dimensioning of the system as well as all necessary 
safety regulations for their design and installation.

These instructions do not imply any liability on the part 

of Energetica Industries. Energetica is only liable within 
the framework of contractual agreements or within the 

framework of assumed guarantees. In addition, Energetica 
Industries assumes no responsibility for the functionality and 

safety of the PV modules.

Please also observe the instructions for other system 
components that are to be part of the photovoltaic system 
very carefully. If necessary, statics must be created for the 
entire project. 

In case we do not adequately answer your questions in these 
instructions, please contact your system supplier first. It is 
the responsibility of the system supplier to ensure that all 
components of the system are technically coordinated and 
comply with each other. 

Information for the operator 

Keep these instructions for the entire service life of the 
photovoltaic system. For information on the formal 
requirements for PV systems, contact your system supplier. 

For information on the formal requirements for PV systems, 
contact your system supplier.
Before installing the PV system, find out about the guidelines 
and approval requirements from the responsible local 
authorities and energy suppliers.
Only if you take these requirements into account can you 
ensure the economic success of your investment.

 

Applicable Documents 

These installation instructions are only valid in conjunction 

with the following technical information.

»

  Product data sheet for the e.Classic M HC or 

  e.Classic M HC black.

»

  Information sheet: Packaging and transport of Energetica 

      modules. 

Page 2

e

Summary of Contents for e.CLASSIC M HC

Page 1: ...INSTALLATION MANUAL e CLASSIC M HC e CLASSIC M HC black www energetica pv com V1 o 26 11 2020...

Page 2: ...tion 4 Electrical connections 5 e ISP Energetica Integrated Shadow Protection 5 Series connection 6 Series connection parallel connection 7 General wiring 8 Grounding 8 Module installation 8 Site cond...

Page 3: ...of the photovoltaic modules e Classic M HC e Classic M HC black from Energetica Industries GmbH hereinafter referred to as the PV module Read this manual carefully before starting the installation All...

Page 4: ...GmbH assumes no liability for damage resulting from failure to observe these instructions It is the responsibility of the system installer to observe the wiring and dimensioning of the system as well...

Page 5: ...ding to the industry standard are determined under conditions of 1 000 W m2 Irradiance and 25 C 77 F solar cell temperature The voltage and amperage can be significantly higher at colder temperatures...

Page 6: ...he module when connecting If the return currents exceed the maximum value specified on the type label or in the data sheet a correctly di mensioned and certified overcurrent device fuse or circuit bre...

Page 7: ...represents a much more effective protection of the module in the event of unforeseen shading and thus optimizes the power loss of the modules in the event of shading IMPORTANT SAFETY INFORMATION Corre...

Page 8: ...s or insulation faults but also personal injury and property damage IMPORTANT SAFETY INFORMATION If the module strings are connected in parallel external diodes blocking diodes adapted to the output a...

Page 9: ...ve the desired amperage If the modules are connected in parallel the total ampe rage is the sum of the amperages of the individual mo dules The voltage of all modules connected in parallel should be i...

Page 10: ...the frame of the solar module can be connected and groun ded according to the drawing below All screws and nuts must be tightened with a torque of 4 5 Nm In order to prevent electric shocks or fires p...

Page 11: ...anufacturer s instructions After installation there must be no electrical parts such as cables between the laminate and the substructure Make sure that the plug connections are never in the water Deta...

Page 12: ...ve parts on your body or clothing In order not to damage the module surface clean the modules as follows Remove snow and ice carefully and without effort For example use a soft broom for this Do not s...

Page 13: ...10 mm 210 mm MV3 Point bearing without rail 1 5 210 mm 210 mm 210 mm MV4 Please note the specification of the permissible static load and the clamping range on the following page The installation vari...

Page 14: ...he clamps or plug in profiles do not touch the glass even under load Make sure that the junction box connection cables do not run between the laminate and the rack rails Make sure that the supporting...

Page 15: ...reverse current load 16 A 16 A Acceptable temperature range 40 C bis 90 C 40 C bis 90 C Protection class junction box IP 68 IP 68 Protection class connector Multicontact MC4 IP68 Multicontact MC4 IP6...

Page 16: ...Notes Page 14 e...

Reviews: