10
3. Assembly and Installation
–Vessel,
Tank, Pump and Suction Fuel Line
This section instructs installing the fuel delivery system (side suction or top suction) and
mounting the vessel.
3.1 Unpacking and Inspection
After unpacking your new boiler, make sure you have received the proper parts and quantities
shown in the checklist on the following page. For missing parts, contact EnergyLogic. If any
parts were damaged during shipment, please contact your shipping carrier.
3.2 Warranty Registration
IMPORTANT: You must register your boiler with EnergyLogic for the warranty to become
active and to receive technical service.
Please take a few minutes to fill out the Warranty Registration Card.
Note: Your Warranty Registration Card may be found in the accessory box where you located
this manual. You may fax the completed card to us at (615) 251-0682, or mail it. You may also
register online at www.energylogic.com.
Call 1-
800-347-9575
for Technical Support