d) verifying that the system has the necessary capacity to perform the proposed operations in
the planned configuration.
e) ensuring the assigned operators have has been notified of adjustments or repairs that
have not yet been completed, prior to commencing operations.
f) designating
personnel
for
inspections as required in the applicable chapter.
g) designating personnel for maintenance, repair, transport, assembly, and disassembly.
h) ensuring that all personnel involved in maintenance, repair, transport, assembly,
disassembly, and inspection are aware of their responsibilities, assigned duties, and the
associated hazards.
i) ensuring that the inspection, testing, and maintenance programs specified by owner are
followed.
1.8.3. The
site
supervisor
In some cases the site supervisor and the system director may be the same person.
The responsibilities of the site supervisor shall include the following:
a) ensuring that the system meets the requirements prior to initial site usage.
b) determining if additional regulations or requirements are applicable.
c) ensuring that a qualified person is designated as the system director.
d) ensuring that the operations are coordinated with other jobsite activities that will be
affected by or will affect the operations.
e) ensuring that the area for the system is adequately prepared. The preparation includes,
but is not limited to, the following:
1. access for the system and associated equipment.
2. sufficient room to assemble and disassemble the system.
3. an operating area that is suitable for the system with respect to levelness, surface
conditions, support capability, proximity to power lines, excavations, slopes,
underground utilities, subsurface construction, and obstructions to operation.
4. traffic control as necessary to restrict unauthorized access to the system's working
area.
5. ensuring that work involving the assembly and disassembly of system is supervised by
a qualified person .
6. ensuring that operators meet the physical, knowledge, and skill requirements as
described in this manual.
7. ensuring that conditions that may adversely affect the operations are addressed. Such
conditions include, but are not limited to, the following:
x
poor soil or support conditions
x
wind velocity or gusting winds
x
weather
conditions
x
extreme
temperatures
x
inadequate
lighting
x
operating
surface
conditions
x
excessive noise proximity to energized sources (e.g., power lines, pressurized
lines)
x
ensuring that work performed by the rigging crew is supervised by a qualified
person
x
ensuring that maintenance is performed by a designated person
1.8.4.
The system director
The system Director's responsibilities shall include the following:
a) being present at the job site during the operations.
b) stopping the operations if alerted to an unsafe condition.
c) ensuring that the preparation of the area needed to support the operation has been
completed before the operation starts.
d) ensuring necessary traffic controls are in place to restrict unauthorized access to the
system's work area.
Summary of Contents for SBL1100
Page 134: ...Document number ED 03622 00 001 R04 ENG Page 134 of 151 ED 02518 00 001 R08 ENG Page 134 ...
Page 136: ...Document number ED 03622 00 001 R04 ENG Page 136 of 151 ED 02518 00 001 R08 ENG Page 136 ...
Page 138: ...Document number ED 03622 00 001 R04 ENG Page 138 of 151 ED 02518 00 001 R08 ENG Page 138 ...
Page 141: ...Document number ED 03622 00 001 R04 ENG Page 141 of 151 ED 02518 00 001 R08 ENG Page 141 ...
Page 142: ...Document number ED 03622 00 001 R04 ENG Page 142 of 151 ED 02518 00 001 R08 ENG Page 142 ...
Page 143: ...Document number ED 03622 00 001 R04 ENG Page 143 of 151 ED 02518 00 001 R08 ENG Page 143 ...
Page 145: ...Document number ED 03622 00 001 R04 ENG Page 145 of 151 ED 02518 00 001 R08 ENG Page 145 ...
Page 146: ...Document number ED 03622 00 001 R04 ENG Page 146 of 151 ED 02518 00 001 R08 ENG Page 146 ...
Page 147: ...Document number ED 03622 00 001 R04 ENG Page 147 of 151 ED 02518 00 001 R08 ENG Page 147 ...
Page 148: ...Document number ED 03622 00 001 R04 ENG Page 148 of 151 ED 02518 00 001 R08 ENG Page 148 ...
Page 149: ...Document number ED 03622 00 001 R04 ENG Page 149 of 151 ED 02518 00 001 R08 ENG Page 149 ...