SOLAR PANEL

INSTALLATION GUIDE

September 2008

Summary of Contents for Solar Panel

Page 1: ...It s easy SOLAR PANEL INSTALLATION GUIDE September 2008...

Page 2: ...llation we do not advise cutting into the roof or drilling lag bolts into the roof On ground installations panels should be insulated from the earth Enersol Products Inc it s agents distributors and s...

Page 3: ...e FEED SUPPLY LOWEST POINT HIGHEST POINT RETURN When splitting system try to balance with equal sections in each bank Never plumb in series from small bank to a larger bank of sections INSTALLATION TY...

Page 4: ...roof drainage For safety reasons do not mount panels against a pool Rack plywood should be mounted 45 or less Support headers with 2x6 lumber Panels may be set on any material that will insulate them...

Page 5: ...om and every 3 ft up thereafter Do not tighten cross strapping too tight to allow for expansion Apply generous amount of roofing cement Screw lag bolts through roofing cement into roof Use roof sealan...

Page 6: ...input and output of the array The HEC clips into place so that the plumbing can be glued to the cut end The HEC can also be used as a spacer around vents and chimneys JOIN ENDCAPS TO HEADERS JOIN PLU...

Page 7: ...ough system install a BALL VALVE between the feed and return lines Open the ball valve gradually to reduce flow or pressure to panels Follow manufacturers instructions for installation of automatic co...

Page 8: ...omote bacterial growth HEADER REPLACEMENT OR RUBBER REPLACEMENT TUBE REPAIR IF A SECTION DEVELOPS A LEAK WINTERIZATION SUMMERIZATION IN HOT CLIMATES Allow 5 or 10 minutes for O ring to seat Replace O...