background image

PLUMBING 
3-WAY CONTROL VALVE

SOLAR VALVE

HEATER

FILTER PUMP

FILTER

SUCTION 
(COOL WATER)

TO 

SOLAR

FROM 
SOLAR

OPTIONAL 
CHECK VALUE

TO POOL

FROM 

POOL

SOLAR
ON

SOLAR 
OFF

PUMP       

FILTER

FILTER   

RETURN 

(WARM WATER)

S W I M M I N G   P O O L

INSTALL OVERVIEW

BY-PASS

FROM 
SOLAR

BACK TO POOL

TO 

SOLAR

If pressure is too great through
system, install a 

BALL VALVE

between the feed and return
lines. 

Open the ball valve gradually
to reduce flow or pressure to
panels.

Follow manufacturers instructions for installation 
of automatic control panel, motorized valve and
sensors, and automatic controls.

FLOW RATES

7

RECOMMENDED PUMP SIZE: 3/4 – 1 HP

IF SOLAR SYSTEM IS UNDERSIZED, 

OR PUMP SIZE IS LARGER, 

FOLLOW BY-PASS INSTRUCTIONS 

RECOMMENDED OPERATING PRESSURE

15 PSI @120° F

MAXIMUM FLUID PRESSURE

20 PSI @ 120° F

RECOMMENDED FLOW RATE

4 – 10 G PM PER 4’ WIDTH

Summary of Contents for Solar Panel

Page 1: ...It s easy SOLAR PANEL INSTALLATION GUIDE September 2008...

Page 2: ...llation we do not advise cutting into the roof or drilling lag bolts into the roof On ground installations panels should be insulated from the earth Enersol Products Inc it s agents distributors and s...

Page 3: ...e FEED SUPPLY LOWEST POINT HIGHEST POINT RETURN When splitting system try to balance with equal sections in each bank Never plumb in series from small bank to a larger bank of sections INSTALLATION TY...

Page 4: ...roof drainage For safety reasons do not mount panels against a pool Rack plywood should be mounted 45 or less Support headers with 2x6 lumber Panels may be set on any material that will insulate them...

Page 5: ...om and every 3 ft up thereafter Do not tighten cross strapping too tight to allow for expansion Apply generous amount of roofing cement Screw lag bolts through roofing cement into roof Use roof sealan...

Page 6: ...input and output of the array The HEC clips into place so that the plumbing can be glued to the cut end The HEC can also be used as a spacer around vents and chimneys JOIN ENDCAPS TO HEADERS JOIN PLU...

Page 7: ...ough system install a BALL VALVE between the feed and return lines Open the ball valve gradually to reduce flow or pressure to panels Follow manufacturers instructions for installation of automatic co...

Page 8: ...omote bacterial growth HEADER REPLACEMENT OR RUBBER REPLACEMENT TUBE REPAIR IF A SECTION DEVELOPS A LEAK WINTERIZATION SUMMERIZATION IN HOT CLIMATES Allow 5 or 10 minutes for O ring to seat Replace O...

Reviews: