background image

2

6 7 8 9 10

4 5

13 14 15 16 17

11

12

3

2

1

0

150

300

450

600

750

900

output power (W)

wind speed (m/s)

POWER CURVE - GE-600-24

6 7 8 9 10

4 5

13 14 15 16 17

11

12

3

2

1

0

200

400

600

800

1000

1200

1400

output power (W)

wind speed (m/s)

POWER CURVE - GE-1200-48

3 Application Range

• Lighting system: 

city street lights, 

 

 

• Highway monitoring

   road lights, landscape lighting

• 

Telecommunication 

    • Offshore oil platform  

 

 

• Isolated island desalination   

 

 

• Wind solar spring system 

 

• Power supply system for ship, home or farm 

4 Wind Turbine Assembly

GE wind turbine assembly has been finished in the factory; installation on site is simpler, 
mainly including mounting blades on the hub, mounting wind turbine on the tower, suspen-
sion setting on site and system wiring.

Please install the whole turbine in accordance with the following instructions.

4.1 Mounting blades of wind turbine

1. Blades (5)
2. Hub for 5 blades.
3. Blade and hub screw down the nuts.
4. Mounting other blades as the same way.
Notice: 

blades should not be reversed nuts should be

tightened.

5. Blades have been mounted on the hub accordingly.
6. Completed pattern.

1

2

3

4

5

6

Summary of Contents for GE-600-24

Page 1: ...GE 600 24 USER MANUAL...

Page 2: ...Do not place the controller inverter and battery in damp rain vibration corrosion and strong electromag netic interference environment the places in direct sunlight near heater or the other heat sour...

Page 3: ...far as possible 2 2 If install two wind turbines on one area the distance between them is 8 10 times of rotor diameter Try to locate the wind turbine in the cleanest turbulent free air as possible Tu...

Page 4: ...m Power supply system for ship home or farm 4 Wind Turbine Assembly GE wind turbine assembly has been nished in the factory installation on site is simpler mainly including mounting blades on the hub...

Page 5: ...ton 2 Mounting the hub with blades onto the motor shaft 3 Tightening the hub by nuts and spring washer and locking up split pin 4 Pressing the cone onto hub strength equally 4 2 Flanged joint assembly...

Page 6: ...controller which is mainly used in low wind speed areas 5 2 Inverter For customers who need AC power it is recommended to use AC220V 50HZ or AC110V 130HZ Inverter the capacity should be determined acc...

Page 7: ...of 5 or less for sites with a 5 4m s average wind speed assuming the standard Rayleigh distribution of wind speeds which is su cient for most sites Refer to the appropriate chart for your system volt...

Page 8: ...to light control mode discon nect any wire of solar panel from controler several minutes later observe whether the light of loads is on or not it is normal it the light is on Then connect the solar p...

Page 9: ...the turbine alternator shaft is damaged the tower is out at vertical in case of these situations the shaft should be replaced and tower verticality must be adjusted 8 5 Generator Abnormal ac Output G...

Page 10: ...ontroller is burned out and needs to be replaced 4 The mode setting on the controller is not correct and needs to be reset according to controller manual 8 9 Wind turbine does not charge battery This...

Page 11: ...voltage up to the recovery of the set points the lights go out Controller detected battery voltage over set limits lights ash voltage down to the recovery of the set points the lights go out Over volt...

Page 12: ...Connected the outside wind generator solar panels street lamp and batteries Safety plate burned open circuit then indicates keep bright state In the case charger over current load over current etc it...

Page 13: ...ator W phase input 6 2 The second loaded negative output 7 2 The second loaded positive output 8 1 The rst loaded negative output 9 1 The rst loaded positive output 10 Battery Batteries positive input...

Reviews:

Related manuals for GE-600-24