5
Ventilation unit operation and maintenance instructions
SAFETY
General
Electrical safety
Always check before opening the service hatch
that the supply voltage of the equipment is
switched off.
Only an authorised electrician may perform any
actions in the electrical box.
In case of malfunction, always find out the reason
for the malfunction before starting the unit again.
Wait for two (2) minutes after switching off the
unit power before you commence with the
maintenance. Although the power is switched off,
the fans continue running and the after-heating
coil stays hot for a while.
DANGER
DANGER
WARNING
WARNING
Should you need any technical support, refer to the
equipment type and serial number in the type plate.
TYPE PLATE
ilmanvaihtolaite
ventilation unit
TYYPPI/TYPE:
W/ V/ HZ / A:
www.enervent.com
SRJ. NRO/SERIAL NO:
IP 20
Summary of Contents for Pinion
Page 1: ...19 October 2017 Enervent Pinion Ventilation unit operation and maintenance instructions ...
Page 2: ...2 Copyright Enervent 2017 Unauthorised copying and distribution is forbidden ...
Page 17: ...17 Ventilation unit operation and maintenance instructions ...
Page 18: ...18 ...
Page 19: ...19 Ventilation unit operation and maintenance instructions ...