XF
Rev: 7, 2008-10-14
Page 16
Insert hole before final filing.
Remove excess material
Use a file to even out the edges of the hole.
Use a vacuum cleaner to clean up.
Remove the sticker before installation.
6.1.6
Test mounting (I)
Test installation of the bracket provisionally (without the bolts) to ensure
optimal adjustment. Trim the hole with a file if necessary.
6.1.7
Placement of bolts
Apply suitable marine sealant in holes for bolts.
Fastening of bolts must be done from the outside of the tunnel (inside boat).
Use the spacer/nut, the washer and the M8 nut as shown in the picture to
press in the bolts. Tighten the nut carefully so that the bolts attach to the
tunnel and then remove the spacer/nut, the washer and nut.
NB:
Carefully grease the upper part of the threads. Do not grease the
contact area between the bolt head and the tunnel.
Use a 13 mm spanner to tighten up the M8 bolts.
Summary of Contents for XForce Series
Page 24: ...XF Rev 5 2008 10 06 Side 24 6 11 Elektriske kobling skjemaer 6 11 1 XForce 20 ...
Page 25: ...XF Rev 5 2008 10 06 Side 25 6 11 2 XForce 40 60 75 90 130 ...
Page 32: ......
Page 56: ...XF Rev 7 2008 10 14 Page 24 7 10 Wiring diagrams 7 10 1 XForce 20 ...
Page 57: ...XF Rev 7 2008 10 14 Page 25 7 10 2 XForce 40 60 75 90 130 ...
Page 64: ......