background image

 

001-01-000083 Rev. 001 

Page 3 of 5 

mounted racks.  Be sure to use the hole symbol 

.  

Drill six (6) 

3/16” pilot holes.  These holes mate with 

the mounting brackets located at the rear corners of 
the frame.  The frame will be fastened with two screws 
in each of the upper brackets and one screw in each 
of the lower brackets, as shown in Figure 6. 

 

f

 Before attempting to fasten the mounting frame to the 

wall, insert a screw into the top pilot hole on either the 
left or right side. Partially thread the screw into the 
hole, leaving the screw head approximately 1/4

” from 

the surface. 

g

 Hold the mounting frame against the wall while resting 

the cutout of the bracket on the installed screw. Align 
the other five mounting holes and install a screw in 
each hole. Tighten all six (6) screws securely. 

B. Frame grounding 

c

 Locate the eight (8) pairs of pre-installed grounding 

screws with lock washers on the crossbar of the 
frame. The grounding screws are 10-32 x 

3/8” on 5/8” 

centers. 

d

 Install a dual ground lug (customer provided) with 

holes on 5/8” centers

 beneath the included screws 

and washers on one pair of grounding holes. Tighten 
the screws to fasten the lug to the mounting frame.  
The example in Figure 7 illustrates the frame 
positioned with grounding screws facing downward.  

e

 Connect a ground wire of appropriate gauge to the 

ground lug and attach the other end of the wire to a 
bonded ground point, per local procedures for network 
equipment. 

 

 

 

 

Figure 7. Frame grounding example 

 

C. Equipment Installation  

c

 

Install rack equipment with 19” hole spacing b

carefully sliding the chassis through the front of the 
WR-10U and aligning chassis mounting ears with the 
threaded holes in the rails of the WR-10U frame. 
Insert and tighten #12-24 machine screws (customer 
provided) on each side of the chassis. An example of 
a fully populated wall rack is shown in Figure 2. 

d

 Attach ground lugs associated with each equipment 

chassis to the threaded ground holes on the WR-10U 
crossbar as needed. 

D. Optional Cable Guide Installation  

c

 To install a cable guide to the side of the mounting, 

first remove the sliding cover from the cable guide. 
Insert two of the #10-

32 x 3/8” screws 

(included in  

CG-5 package) through the cable guide and into the 
threaded holes on the side of the WR-10U frame 
(Figure 8). 

d

 

 

Groom cabling from the front of the chassis to the wall 

through the cable guide on the side of the WR-10U, as 
shown in Figure 9, and replace the sliding cover. 

 

Figure 6. Mounting screw locations 

 

Figure 7. Mounting screw locations 

Reviews: