12
IMPORTANT!
READ
AND
FOLLOW
ALL
INSTALLATION
AND
MAINTENANCE
INSTRUCTIONS,
INCLUDING
CLEANING
THE
UNIT
AS
SPECIFIED,
AND
REPLACING
GASKETS
ANNUALLY,
AND
PARTS
AS
NEEDED.
ENGLAND’S
STOVE
WORKS
IS
NOT
RESPONSIBLE
FOR
ANY
DAMAGE
OR
INJURY
INCURRED
DUE
TO
NEGLECT,
OR
DUE
TO
UNSAFE
INSTALLATION
OR
USAGE
OF
THIS
PRODUCT.
CALL
TECHNICAL
SUPPORT
WITH
ANY
QUESTIONS.
INSTALLATION
Approved
Venting
Method
2:
Through
the
Ceiling
Venting
through
the
ceiling/roof
may
be
the
only
feasible
venting
option
in
some
cases
and
is
a
factory
recommended
installation.
When
installing
any
venting
system,
Type
L
or
Type
PL
pipe
must
be
used
and
all
clearances
to
combustibles
listed
by
the
pipe
manufacturer
must
be
strictly
adhered
to.
Use
the
pipe
manufacturer’s
approved
ceiling
support
for
passing
through
a
combustible
ceiling,
as
well
as
the
required
fire
stops,
radiation
shields,
flashing
and
storm
collar.
Be
certain
to
follow
the
manufacturer’s
required
height
of
termination
above
the
roof
line,
and
maintain
at
least
the
minimum
clearances
to
combustibles.
Use
an
appliance
collar
where
the
pellet
vent
connects
to
the
exhaust
output
of
the
pellet
stove
and
attach
the
appliance
collar
to
the
exhaust
blower
output
using
three
sheet
metal
screws.
Seal
each
pipe
connection
joint
with
high
temperature
RTV
Silicone,
to
ensure
the
system
is
leak
free
(Check
with
the
specific
pipe
manufacturer’s
instructions
before
doing
so).
If
the
pellet
vent
pipe
being
used
is
not
a
“Twist
Lock”
system,
three
(3)
sheet
metal
screws
are
required
at
each
pipe
joint.
Connect
the
pellet
stove
to
outside
combustion
air
using
the
kit
included
with
your
stove
or
using
an
alternative
method,
as
described
in
the
“Outside
Air”
section,
on
page
16.
This
venting
method
can
also
be
modified
so
that
the
venting
system
runs
horizontally
through
the
wall
from
the
stove,
then
transitions
to
vertical
and
terminates
above
the
roofline.
When
using
this
modified
version
of
this
installation
be
certain
to
carefully
follow
the
venting
system
manufacturer’s
instructions
diligently.
Please
Note:
Installation
diagrams
are
for
reference
purposes
only
and
are
not
drawn
to
scale,
nor
meant
to
be
used
as
plans
for
each
individual
installation.
Please
follow
all
venting
system
requirements,
maintain
the
required
clearances
to
combustibles,
and
follow
all
local
codes.
For
high
altitude
installations
(above
4,000
ft.),
the
vent
pipe
should
be
increased
from
3
‐
inch
(3”)
to
four
‐
inch
(4”).
Summary of Contents for 25-CBPAH
Page 52: ......