40
IMPORTANT!
READ
AND
FOLLOW
ALL
INSTALLATION
AND
MAINTENANCE
INSTRUCTIONS,
INCLUDING
CLEANING
THE
UNIT
AS
SPECIFIED,
AND
REPLACING
GASKETS
ANNUALLY,
AND
PARTS
AS
NEEDED.
ENGLAND’S
STOVE
WORKS
IS
NOT
RESPONSIBLE
FOR
ANY
DAMAGE
OR
INJURY
INCURRED
DUE
TO
NEGLECT,
OR
DUE
TO
UNSAFE
INSTALLATION
OR
USAGE
OF
THIS
PRODUCT.
CALL
TECHNICAL
SUPPORT
WITH
ANY
QUESTIONS.
REPLACING
COMPONENTS
Control
Board
The
Control
Board
(Part
#
PU
‐
CB19)
is
a
digital
read
‐
out
board.
This
board
offers
a
wide
variety
of
settings
to
operate
the
unit.
The
right
side
panel
should
be
removed
prior
to
removing
the
control
board,
using
a
5
/
16
”
wrench
or
nut
driver.
The
control
board
can
be
removed
from
the
unit
by
loosening
the
two
outside
screws
and
pulling
the
board
back
to
the
inside
of
the
stove.
A
6
‐
amp
“quick
‐
blow”
fuse
is
used
on
this
Control
Board.
NOTE:
The
bottom
three
control
buttons
are
preset
at
the
factory
and
are
not
user
adjustable.
See
the
“Daily
Operation”
section
on
page
18
of
the
manual
for
more
instructions
on
Control
Board
settings.
Recommended
Heat
Ranges:
Low
Burn:
Heat
Range
setting:
1
Room
Air
Blower
setting:
1
Medium
Low:
Heat
Range
setting:
2
–
3
Room
Air
Blower
setting:
*
Medium
High:
Heat
Range
setting:
4
–
8
Room
Air
Blower
setting:
*
High
Burn:
Heat
Range
setting:
9
Room
Air
Blower
setting:
9
*
NOTE:
Blower
Speed
will
automatically
be
adjusted
to
the
desired
Heat
Range
that
you
select.
Summary of Contents for 25-CBPAH
Page 52: ......