IMPORTANT!
READ AND FOLLOW
ALL
INSTALLATION AND MAINTENANCE INSTRUCTIONS, INCLUDING
CLEANING THE UNIT AS SPECIFIED, AND REPLACING GASKETS ANNUALLY, AND PARTS AS NEEDED.
ENGLAND’S STOVE WORKS IS NOT RESPONSIBLE FOR ANY DAMAGE OR INJURY INCURRED DUE TO NEGLECT, OR
DUE TO UNSAFE INSTALLATION OR USAGE OF THIS PRODUCT. CALL TECHNICAL SUPPORT WITH ANY QUESTIONS.
19
Vacuum Switch
This unit is equipped with Vacuum Shut Down Switches (Part #
PU-VS
and
CU-VS
), which help
control various functions of the unit. If an operational error occurs in the unit, a switch will either stop
the top (feed) auger or shut the unit off; if the unit turns off an E-1 Code (error code) will appear in
the Heat Range and Blower Speed windows of the Control Board. Situations which could cause this
include power failure, Combustion Blower failure, improper flue installation, a blocked flue (from
rodents, nests, etc.), or “dirty burning” from burning improper fuel (see “Important Information” at the
beginning of the manual).
“Door Ajar” Vacuum Switch Port
NOTE:
The "door ajar" vacuum switch port must be kept clean, or the top auger will cease to function.
Locate the port hole to the right of the burn pot and, with the stove unplugged and cooled down, use a
brush or pipe cleaner (not a vacuum) to keep this port clear of ash or other debris (see picture).
Port is located to the right
of the burn pot
Summary of Contents for 25-PDVC
Page 39: ......