IMPORTANT!
READ AND FOLLOW
ALL
INSTALLATION AND MAINTENANCE INSTRUCTIONS, INCLUDING
CLEANING THE UNIT AS SPECIFIED, AND REPLACING GASKETS ANNUALLY, AND PARTS AS NEEDED.
ENGLAND’S STOVE WORKS IS NOT RESPONSIBLE FOR ANY DAMAGE OR INJURY INCURRED DUE TO NEGLECT, OR
DUE TO UNSAFE INSTALLATION OR USAGE OF THIS PRODUCT. CALL TECHNICAL SUPPORT WITH ANY QUESTIONS.
20
Control Board
The Control Board (Part #
PU-CB04
) is a digital read-out board. This board offers a wide variety
of settings to operate the unit. This part can be removed from the unit by loosening the two outside
screws and pulling the board back to the inside of the stove. The rear access panel should be
removed prior to removing the control board. A 6-amp “quick-blow” fuse (Part #
PU-CBF6
) is used
on this Control Board.
NOTE:
The bottom three control buttons are preset at the factory and should
not
require any
changes. See “Operating Instructions” and “Daily Operation” section of the manual for
instructions on other Control Board settings.
Recommended
Heat Ranges:
Low Burn:
Heat Range setting: 1
Room Air Blower setting: 1
Medium Low:
Heat Range setting: 2 – 3
Room Air Blower setting: *
Medium High:
Heat Range setting: 5 – 8
Room Air Blower setting: *
High Burn:
Heat Range setting: 9
Room Air Blower setting: 9
* NOTE: Blower Speed should match the Heat Range setting.
NOTE: The bottom
3 buttons are pre-set at
the factory and do not
need adjustment.
Call Service at
(800) 245-6489 if you
have questions or
problems.
CAUTION:
Illustration 3
Control Board
Diagram
Caution
Should you see any evidence of smoke in the hopper (smoke back),
immediately close and latch the hopper lid and door to the unit. Open the
nearest windows and door to the outside, then press the OFF button and let
the unit cool for at least 3 hours. Do not open the door or hopper lid. This
is a maintenance problem that needs to be addressed.
Call Technical Support at (800) 245-6489
Summary of Contents for 25-PDVC
Page 30: ......