850
2
3
How to Install the Slide Bar
INSTALLATION
INSTALLATION CHECKOUT
Ensure that all coupling nuts are tightened. Turn on main water supply & check for leaks.
Repair as needed.
Select a location on vertical wall to install shower column according to
rougn-in dimensions. Mark wall for top mounting position.
Measure 850mm vertically down and mark lower mounting position.
Drill a hole in wall at both positions.
Fix mounting brackets (1) to wall using screws. Align slot on top
mounting bracket horizontally and bottom mounting bracket vertically.
Screw lower tube (5) into top tube (3) through top support (4).
Attach diverter (7) to shower column assembly.
Connect assembly to brackets and tighten grub screws to hold in place.
Connect water supply hose(600mm) to front inlet (9) of diverter
and to elbow (10).
Connect hand shower hose(1.5m) to back outlet (8) of diverter
and to hand shower (11).
Run hot and cold water for a minute to remove any debris.
Attach shower head (2) to top tube (3).
Ensure that all connections are sealed properly.
CLEANING INSTRUCTIONS
All Finishes: Clean the finish with mild soap and warm water. Wipe entire surface completely dry with
clean soft cloth. Many cleaners may contain chemicals, such as ammonia, chlorine, toilet cleaner etc.
which could adversely affect the finish and are not recommended for cleaning.
Do not use abrasive cleaners or solvents on Englefield faucets and fittings.
4
1
1
5
6
9
11
10
8
7
CONTACT AND WARRANTY INFORMATION
NEW ZEALAND
KOHLER NZ LTD
Free Ph: 0800 100 382
Free Fax: 0800 664 488
www.englefield.co.nz
AUSTRALIA
KOHLER CO.
Free Ph: 1 800 ENGLEFIELD
(1 800 364 533)
www.englefield.com
For warranty information, please visit our website
Page 2
1217518-A02-A 04/12/2013
www.englefield.co.nz
INSTALLATION INSTRUCTIONS
STUDIO
Dual Rain Shower