Issue 1
ENKI®
WWW.HOUSEOFENKI.COM
4
INSTALLATION
(See diagram)
§
Prepare the supply pipes ensuring the pipework is parallel and set at 45mm centres.
§
The pipework must be flushed prior to installation.
§
After flushing the pipework, install the mixer as a standard exposed fitting, with the outlet
facing downwards.
§
The hot supply pipe must be connected to the hot inlet of the mixer, indicated by the red dot.
§
Place the trim plate and seals over the brass tails.
§
Offer the valve to the wall and place the tails through the holes in the wall.
§
From the rear connect the back nuts and tighten up to the rear, ensuring the valve is vertical.
§
Secure the valve into position and connect to the water supply pipes, ensuring a good watertight
seal is created.
§
Once secured and connected, turn on water supply and check for leaks.