14.
In case the top surface finishing of
the foundation is good (flat and
smooth), the foundation is finished.
15.
In case the finishing of the top
surface is not good, a final layer must be
added.
16.
When the concrete is cured, remove
the fixing bolts template. Make a
rectangle of wood and pour a 25mm
layer with non shrink grout according to
the drawing.
The bolt must have 160mm
out of the non shrink grout.
17.
Take away, with the help of a
hammer, the 4 pieces of wood located
around the foundation and cover the
concrete area with the soil removed
from the hole.
160mm