Code: I.H4.V10.3003
Installation and Maintenance Manual
Version: 07
2 / 66
Ennera Energy and Mobility, S.L.
This document contains confidential information which is property of Ennera Energy and Mobility, S.L. The copy, transmission or use by other people, of the whole document or
part of its contents, is not allowed without written permission from Ennera Energy and Mobility S.L.
CONTENTS
1.
INTRODUCTION ...................................................................................................................4
1.1.
Aim ..............................................................................................................................4
2.
PRIOR CONSIDERATIONS ....................................................................................................5
3.
PACKING LIST ......................................................................................................................5
4.
LIST OF ASSEMBLY TOOLINGS .............................................................................................6
4.1.
Foundation ..................................................................................................................6
4.2.
Elevation ......................................................................................................................6
4.3.
Tower assembly ...........................................................................................................7
4.4.
Wind turbine assembly ................................................................................................7
5.
INSTALLATION .....................................................................................................................8
5.1.
Foundation ..................................................................................................................8
5.2.
Ennera design multi-section tower assembly ............................................................. 13
5.3.
Ennera design 2-section tower assembly .................................................................... 17
5.4.
Ambor design 3 section tower assembly .................................................................... 17
5.5.
Lifting mechanism ...................................................................................................... 17
5.6.
Anemometer installation ........................................................................................... 21
5.7.
Small Wind Turbine assembly .................................................................................... 21
5.7.1.
Windera S packaging ........................................................................................................................ 21
5.7.2.
Yaw.................................................................................................................................................. 22
5.7.3.
Generator ........................................................................................................................................ 23
5.7.4.
Rotor................................................................................................................................................ 24
5.7.5.
Tail .................................................................................................................................................. 26
5.8.
Electrical connections ................................................................................................ 26
5.8.1.
Converter set .................................................................................................................................... 26
5.8.2.
Cable connections............................................................................................................................. 28
5.8.3.
Electrical scheme .............................................................................................................................. 31
5.8.4.
Anemometer .................................................................................................................................... 31
5.9.
Wind turbine erection ................................................................................................ 32
6.
SCREW KITS ....................................................................................................................... 35
6.1.
Tower assembly kit .................................................................................................... 35
6.2.
Wind turbine assembly kit ......................................................................................... 35
6.3.
Anemometer assembly kit ......................................................................................... 36
6.4.
Converter assembly kit............................................................................................... 36
7.
COMMISSIONING .............................................................................................................. 36
7.1.
Load new firmware .................................................................................................... 36
7.2.
Change parameters .................................................................................................... 37