14.
Take the other tip of the elevation
cable (W17) (previously fixed to the
fourth section) and attach it to the
eyebolt of the ginpole with a shackle.
Check alignment of the
ginpole and the tower in
the lifting direction.
15.
Once everything is connected,
continue lifting up the ginpole with the
tractel.
16.
After the ginpole (EL-6) is in vertical
position, keep working with the tractel
(EL-3) until the tower is in vertical
position.
17.
Level the nuts and washers to the
position where the tower is vertical.
18.
Once the lift-up test is performed,
lift the tower down to its resting
position.