Code: I.H4.V10.3003
Installation and Maintenance Manual
Version: 07
21 / 66
Ennera Energy and Mobility, S.L.
This document contains confidential information which is property of Ennera Energy and Mobility, S.L. The copy, transmission or use by other people, of the whole document or
part of its contents, is not allowed without written permission from Ennera Energy and Mobility S.L.
5.6.
Anemometer installation
1.
The anemometer is installed at 10m
height in the flange connection of the
tower.
2.
First, connect the 2 parts of the
anemometer with the M10x40 screw
and nut.
The anemometer must be
installed
facing
the
prevailing wind direction.
3.
Connect the base of the U-shaped
bar to one screw of the tower flange.
4.
Fasten the hose clamp in the tower
for the bottom part of the structure.
5.
Assemble the anemometer in the
bar end with the 2 holes and screws
supplied with the anemometer.
6.
Fix the cable with ties along the bar
and make a hole in the tower to enter
the cable inside the tower. The cable
can also be guided by the external part
of the tower to the converter.
7.
Put some sealant in the hole not to
damage the cable.
5.7.
Small Wind Turbine assembly
5.7.1.
Windera S packaging
1.
The Windera S wind turbine parts
are packaged in a wooden box.
Anemometer cable hole