Code: I.H4.V10.3003
Installation and Maintenance Manual
Version: 07
38 / 66
Ennera Energy and Mobility, S.L.
This document contains confidential information which is property of Ennera Energy and Mobility, S.L. The copy, transmission or use by other people, of the whole document or
part of its contents, is not allowed without written permission from Ennera Energy and Mobility S.L.
The next table lists the setup parameters that will be asked to be configured by the installer.
Id.
Parameter
Description
0002
Connection cable length
Defines the connection cable length (m) used to connect the
wind turbine converter to the grid connection point.
0003
Connection cable section
Defines the connection cable section (mm
2
) used to connect
the wind turbine converter to the grid connection point.
0004
Device Identifier
Device identifier used to identify the WT in the supervision
centre. It should be set to the sequential part of the Windera
Serial Number (I.H4.R-xxxxxxx)
0009
Grid Code
Defines electrical characteristics relative to the grid
connection requirements of the installation country:
0: SP - Spain
1: GB – Great Britain
2: JO – Jordan
3: GE - Germany
4: J50 – Japan 50Hz
5: J60 – Japan 60 Hz
6: PO – Portugal
000B
Site Altitude
Altitude over sea level (m) of the installation site
000C
Site Temperature
Ambient temperature average (ºC) of the installation site
000D
Site Humidity
Relative humidity average (%)of the installation site
After changing all the setup parameters, The Windera-S converter should be reset.
Once the Windera S has been assembled and the parameters of the converter have been
changed, it’s time to carry out the first start-up.