Code: I.H4.V10.3003
Installation and Maintenance Manual
Version: 07
6 / 66
Ennera Energy and Mobility, S.L.
This document contains confidential information which is property of Ennera Energy and Mobility, S.L. The copy, transmission or use by other people, of the whole document or
part of its contents, is not allowed without written permission from Ennera Energy and Mobility S.L.
Inside the wind turbine package there are the following components:
COMPONENT
CODE
UNITS
W1 Generator
JI.H4.G5.4000.00
1
W2 Brake
JI.H4.K5.4000.00
1
W3 3 blade set
JI.H4.B5.4000.01
1
W4 Converter
JI.H4.P5.4000.01
1
W5 Tail
JI.H4.N5.4000.01
1
W6 Yaw
JI.H4.Y5.4000.00
1
W7 Tower cable (3x6mm
2
)
JI.H4.P5.4000.05
1
W8 Cone
JI.H4.B5.4000.05
1
W9 Hub
JI.H4.B5.4000.04
1
W10 Hub bushing
JI.H4.B5.4000.06
1
W11 Blade fixing plate
JI.H4.B5.4000.07
3
W12 Yaw cover
JI.H4.Y5.4000.50
1
W13 Converter housing
JI.H4.P5.4000.04
1
W14 Converter structure
JI.H4.P5.4000.02
1
W15 Screw kits (4 ref.)
JI.H4.V5.4000.03
JI.H4.P5.4000.07
JI.H4.T5.4000.05
JI.H4.T5.4000.13
1
1
1
1
W16 Earthing cable
JI.H4.P5.4000.06
1
W17 Elevation cable 8.3m
JI.H4.T5.4000.06
1
W18 Shackle 3.25Tn
JI.H4.T5.4000.10
1
W19 Anemometer
JI.H4.T5.4000.11
1
W20 Anemometer structure
JI.H4.T5.4000.12
1
W21 Nameplate
JI.H4.V5.4000.06
1
4.
LIST OF ASSEMBLY TOOLINGS
4.1.
Foundation
Reference Tooling
Nº units
Drawing
FD-1
Tower bolts
8
JI.H4.T5.4000.04
FD-2
Bolts position tooling
1
JI.H4.V10.4000.51
4.2.
Elevation
Reference Tooling
Nº units
EL-1
Tractel ground fixing point
1
EL-2
Fixing point tooling
1
EL-3
Tractel 1600 kg
1
EL-4
Shackle 3.25Tn
2
EL-5
Tractel cable 15m
1
EL-6
GinPole Ø114.3mm, L=4m
1
EL-7
Hydraulic jack
2
EL-8
Hexagon bolt M20x180
1
EL-9
Spanner 46
1