INSTALLATION TIPS

Installing multiple conductors in a single CT 

If you need to install multiple conductors in a single CT, 

you must ensure that the conductors terminate on the 

same line conductor, so the voltage at the terminals of the 

two conductors will be 0V between them. 
There are some challenges to this approach:

It is easy to make a wiring error.

The conductors must fit within the CT.

All of the conductors on Line 1 must be bundled and 

with the loads on the Line 1 CT.

All of the conductors on Line 2 must be bundled and 

with the loads on the Line 2 CT.

All of the conductors on Line 3 must be bundled and 

with the loads on the Line 3 CT.

You may need to extend some of the circuits. 

It is often possible to run all of the conductors in a service 

panel through a single set of consumption CTs.

Installing parallel-connected CTs for 200A services and in crowded 
service panels 

It may be difficult to install multiple conductors through a single CT 

when some of the conductors enter from the bottom of the service 

panel and others enter from the top. Also, some service panels have 

200A services that are provided by a set of two 100A conductors and 

parallel-connected 100A circuit breakers. In those scenarios, you can 

use a set of parallel-connected consumption CTs to monitor the home’s 

consumption. Do this by installing two consumption CTs, one on each 

line conductor and then parallel-connecting the output conductors at the 

Envoy CT wiring terminals or in a wire connector prior to landing in the 

Envoy terminals.

6

5

2

8

I1●

I1

I2●

I2

I3●

I3 

I1●

I1

I2●

I2

I3●

I3

1 / 5 2 / 6 3 / 7 4 / 8

NO

RefGen Com / DRM Ø

C

Production

Consumption

Digital Input

Relay

PD, B300

OVC II

 

CU, 2.5 mm

2

, 75C

MEAS CAT III

OVC III

L1

L2

L3

N

0   1   2   3   4   5   6   7  8

AU/NZ: DRM Port

7

1

4

N

L1

L2

L3

UP

TO 250 

Vac.

100A

0.5V

45-66Hz

U

P

TO 250 

Vac.

100
A

0.5V

45-66Hz

3

KEY:

1. Production CT
2. Main isolator switch
3. To Meter
4. Consumption CT

5. Output from PV system

6. Electrical panel
7. Envoy-S terminal block
8. Not used

PRELIMINARY

• 

To monitor consumption on Line 2

Connect the white wire to the “I2•” terminal and the blue 

wire to the “I2”terminal.

Clamp the CT on the main supply Line 2. When the con-

sumption CT is on Line 2 conductor, the arrow must point 

toward the load (away from the grid). 

• 

To monitor consumption on Line 3

Connect the white wire to the “I3•” terminal and the blue 

wire to the “I3” terminal.

Clamp the CT on the main supply Line 3. When the con-

sumption CT is on Line 3 conductor, the arrow must point 

toward the load (away from the grid). 

 

Tighten all connections to 0.56 N m.

C )  Close and secure the terminal block door of the Envoy.
D )  Turn on the PV system.