background image

Load Center

To Grid

To Solar Subpanel

Pr

oduction CT.

Solid

 Core.

The arrow must point  toward the load — away  from the solar array.

IQ8D Commercial Gateway 

Terminal Block

Relay contacts (if needed)

Not used    

Consumption CT.

Split Core. The arrows must point  toward the load — away  from the grid.

 

L2: Red

L3: Blue

N: White

L1: White

L1: Blue

L3: White

L3: Blue

L2: White

L2: Blue

L2: White

L2: Blue

L3: White

L3: Blue

L1: White

L1: Black

Production

Consumption

P1

C1

C2

1

2

3

4

NO

 Ref

Common

C

Digital Input

Relay

PD, B300

OVC II

L1

L2

N

CU, 75C, 14

AWG MIN

MEAS C

AT

 III

OVC III

Production  |  Consumption

L3

P2

P3

C3

U80002 YYWW 

FALCO

POLLUTION DEGREE 3

L1: Blue

IQ8D Commer

cial Gatewa

y Wiring

Summary of Contents for IQ8D

Page 1: ... bridge with Ethernet cables order EPLC 01 You must use a ferrite bead on the Ethernet cable we recommend Fair Rite 0431167281 Ethernet cable 802 3 Cat5E or Cat6 unshielded twisted pair UTP Do not use shielded twisted pair STP cable You must use a ferrite bead on the Ethernet cable we recommend Fair Rite 0431167281 H Create a paper installation map to record device serial numbers and positions in ...

Page 2: ...ion on Line 1 Connect the white wire to the white C1 and the blue wire to the blue C1 terminal Clamp the CT on the main supply Line 1 When the consumption CT is on Line 1 conductor the arrow must point toward the load away from the grid To monitor consumption on Line 2 Connect the white wire to the white C2 terminal and the blue wire to the blue C2 terminal Clamp the CT on the main supply Line 2 W...

Page 3: ...e arrows must point toward the load away from the grid L2 Red L3 Blue N White L1 White L1 Blue L3 White L3 Blue L2 White L2 Blue L2 White L2 Blue L3 White L3 Blue L1 White L1 Black Production Consumption P1 C1 C2 1 2 3 4 NO Ref Common C Digital Input Relay PD B300 OVC II L1 L2 N CU 75C 14AWG MIN MEAS CAT III OVC III Production Consumption L3 P2 P3 C3 U80002 YYWW FALCO POLLUTION DEGREE 3 L1 Blue IQ...

Page 4: ... check the Overview screen for the following A Confirm that the expected number of devices are detected and com municating B Check that the new profile is set on all the devices Setting the profile may take up to 5 minutes for a typical system C Tap the Meters button D Tap Production Meter and follow the on screen instructions to enable the Production Meter E If you installed consumption metering ...

Page 5: ...tem name from the Activa tion List on the dashboard D From the activation form open Array Builder If you used Enphase Installer App to build arrays and scan device serial numbers the array s are built make any necessary adjustments in Array Builder If you did NOT use Enphase Installer App to build arrays and scan device serial numbers create the virtual array in Array Builder using the installa ti...

Page 6: ...pport DANGER Risk of electric shock Always open or disconnect circuit from power distribution system or service of building before installing or servicing current transformers CTs DANGER Risk of electrocution Do not install CTs when cur rent flowing in the sensed circuit Always install CT wires in the terminal blocks before energizing the sensed circuit DANGER Risk of electric shock Do not use Enp...