background image

Register the IQ8D Commercial  Gateway in Enphase Installer App (

enlight-

en.enphaseenergy.com)

.

Method A  // If the IQ8D Commercial Gateway is associated with a system 

in Enphase Installer App

A )  On your mobile device, go to Settings and disconnect from the Gate-

way’s Wi-Fi network.

B )  Return to the Enphase Installer App and tap the 

Sync 

button on the 

System Overview screen.

      Activate Monitoring

a

 

LED overview

LED

State

Description

All

Flashing amber in unison

The IQ8D Commercial Gateway is booting up

Flashing green sequentially Software upgrade in progress

Network

communica-

tions

Solid green

Communicating with Enphase Installer App

Flashing green

WPS connection in progress or the IQ8D 

Commercial Gateway is attempting to con-

nect to Enphase Installer App

Solid amber

Local network connection only

Off

No network connection

AP mode

Solid green

AP mode enabled: 

IQ8D Commercial Gateway Wi-Fi network 

available

Off

AP mode disabled:

IQ8D Commercial Gateway Wi-Fi network 

unavailable

Power  

production

Solid green

All communicating Microinverters are 

producing

Flashing green

Microinverter upgrade in progress

Solid Amber

At least one Microinverter is not producing

Off

Microinverters are not producing or commu-

nicating (low light or night time)

Device

communica-

tions

Solid Green

All devices are communicating

Flashing Green

Device scan in progress

Solid Amber

At least one device is not communicating

Off

Devices are not communicating 

(low light or night time)

TROUBLESHOOTING

b

 

Device detection issues

If the Device Communications LED 

 lights solid amber, it may be a 

result of low light levels. If there isn’t enough sunlight to power up the 

Microinverters, they can’t communicate with the Gateway.

If there is sufficient daylight for the Microinverters to power up, the issue 

may be that the IQ8D Commercial Gateway is having difficulty communi

-

cating over the power lines. To troubleshoot this issue: 

•  Check the Enphase Installer App to see which devices are not com-

municating. 

•  Check that the circuit breaker(s) for the PV array are in the “ON” 

position. 

•  Verify that the PV modules are connected to the Microinverters. 

•  Verify the PV module DC voltage is within the allowable range for 

the Microinverter.

      Send System Summary Report

When you have completed your system setup, you can generate and 

email a summary report.
A )  From Enphase Installer App, tap 

Done 

in the upper-right corner of the 

screen to disconnect from the Gateway. Enphase Installer App will 

ask if you want to view a summary report.

B )  Tap 

View Report. 

The report displays IQ8D Commercial Gateway 

and system information with a list of device serial numbers, their last 

power reports, and information about the grid profile applied to the 

devices.

C )  Tap 

 to email the report as needed as a record of successful sys-

tem installation and for evidence of grid profile settings.

7

8

C )  When you have access to a computer with Internet access, log in to 

Enphase Installer App and select the system name from the Activa-

tion List on the dashboard.

D )  From the activation form, open Array Builder.
If you used Enphase Installer App to build arrays and scan device serial 

numbers, the array(s) are built  —make any necessary adjustments in Array 

Builder.
If you did NOT use Enphase Installer App to build arrays and scan device 

serial numbers, create the virtual array in Array Builder using the installa-

tion map as your reference. (You may need to wait if the devices have not 

yet reported to Enphase Installer App.) 

Method B // If the IQ8D Commercial Gateway is NOT associated with a 

system in Enphase Installer App

A )  Log into Enphase Installer App and click 

Add a New System

 from the 

dashboard.

B )  Enter the System, Installer, Owner, and Location information.
C )  Enter the IQ8D Commercial Gateway serial number.
D )  Click 

Save

 to submit the form.

E )   After the devices have reported to Enphase Installer App, open Array 

Builder from the activation form, and create the virtual array, using the 

installation map as your reference.

c

 

Power production issues

If the Power Production LED   lights solid amber, check the Enphase 

Installer App to see which Microinverters are not producing:

•  If none of the Microinverters are producing power, there may be a 

grid or wiring issue. First, verify that there is proper input voltage 

and frequency from the grid. Next, check the breaker and wiring, 

starting at the load center.

•  If all the non-productive Microinverters are on the same branch, 

check the breaker and wiring starting at the junction box for the 

affected branch.

•  If only one or scattered Microinverters are not producing power, 

first check to see that the AC connectors are fully connected. Next, 

check that each module is providing the required startup voltage 

for the Microinverter (22V). A PV module that is failing or that is 

undersized may not generate enough power for AC conversion.

d

 

Internet connection issues

If you are using Wi-Fi and the Network Communications LED 

 remains off:

•  The WPS connection window may have timed out. Retry the con-

nection steps.

•  Make sure that the broadband router is operational by checking that 

other devices at the site can access the network. 

•  Be aware that metal enclosures or obstructions impede wireless 

communication. 

•  If you cannot see your router or access point in the list on the Gate-

way, or cannot maintain a connection, it may be necessary to add a 

wireless repeater to extend the network range.

If you are using Wi-Fi and the Network Communications LED lights solid 

amber, make sure that the broadband router is connected to the Internet 

by checking that other devices at the site can access the Internet.
If you are using the Enphase Mobile Connect modem and the Network 

Communications LED remains off or lights solid amber, see Troubleshoot-

ing in the Enphase Mobile Connect Installation Guide.
For any connection method, you can troubleshoot network issues with 

the Enphase Installer App by tapping the 

Network

 button, then 

Diagnostic 

Tools

.

If you replace the broadband router, configure the IQ8D Commercial 

Gateway Wi-Fi settings for the new Wireless Network Name (SSID) and 

password. Or use the WPS function described in step 6.

Summary of Contents for IQ8D

Page 1: ... bridge with Ethernet cables order EPLC 01 You must use a ferrite bead on the Ethernet cable we recommend Fair Rite 0431167281 Ethernet cable 802 3 Cat5E or Cat6 unshielded twisted pair UTP Do not use shielded twisted pair STP cable You must use a ferrite bead on the Ethernet cable we recommend Fair Rite 0431167281 H Create a paper installation map to record device serial numbers and positions in ...

Page 2: ...ion on Line 1 Connect the white wire to the white C1 and the blue wire to the blue C1 terminal Clamp the CT on the main supply Line 1 When the consumption CT is on Line 1 conductor the arrow must point toward the load away from the grid To monitor consumption on Line 2 Connect the white wire to the white C2 terminal and the blue wire to the blue C2 terminal Clamp the CT on the main supply Line 2 W...

Page 3: ...e arrows must point toward the load away from the grid L2 Red L3 Blue N White L1 White L1 Blue L3 White L3 Blue L2 White L2 Blue L2 White L2 Blue L3 White L3 Blue L1 White L1 Black Production Consumption P1 C1 C2 1 2 3 4 NO Ref Common C Digital Input Relay PD B300 OVC II L1 L2 N CU 75C 14AWG MIN MEAS CAT III OVC III Production Consumption L3 P2 P3 C3 U80002 YYWW FALCO POLLUTION DEGREE 3 L1 Blue IQ...

Page 4: ... check the Overview screen for the following A Confirm that the expected number of devices are detected and com municating B Check that the new profile is set on all the devices Setting the profile may take up to 5 minutes for a typical system C Tap the Meters button D Tap Production Meter and follow the on screen instructions to enable the Production Meter E If you installed consumption metering ...

Page 5: ...tem name from the Activa tion List on the dashboard D From the activation form open Array Builder If you used Enphase Installer App to build arrays and scan device serial numbers the array s are built make any necessary adjustments in Array Builder If you did NOT use Enphase Installer App to build arrays and scan device serial numbers create the virtual array in Array Builder using the installa ti...

Page 6: ...pport DANGER Risk of electric shock Always open or disconnect circuit from power distribution system or service of building before installing or servicing current transformers CTs DANGER Risk of electrocution Do not install CTs when cur rent flowing in the sensed circuit Always install CT wires in the terminal blocks before energizing the sensed circuit DANGER Risk of electric shock Do not use Enp...

Reviews: