B)
Connect the conductors to the contact carrier. Match the assign-
ment according to the label on the contact carrier.
*
WARNING
: Ensure that the correct connection for Line, Neutral,
Earth match according to the label on the contact carrier. In case
of mismatch, phase balance of system will be affected.
NOTE:
For flexible wires, we recommend using ferrules acc. to
DIN 46228 that are crimped with jointing clamp.
C)
Torque the contact carrier screws to 1 Nm.
D)
Push the contact carrier into the housing until it snaps in audibly.
E)
Tighten the cable gland to a torque of 4.5 Nm.
*
WARNING
: Observe the permitted bending radius during installation.
The degree of protection might fail if the bend radius is exceeded.
A)
Prepare the cable:
• Push the cable gland over the cable.
• If there are multiple seals, select a seal that fits your cable
diameter.
• Push the housing with seal over the cable.
• Strip 50mm from the cable.
• Shorten conductors N, L1, L2, and L3 by 8 mm, but keep PE (ground)
at 50mm.
• Strip 12mm from the conductors.
ASSEMBLY
Follow the steps to assemble Enphase Field Wireable QD Connectors for three-phase.
FEMALE
MALE
N
3
Click
Click
Loosening the cable
• Loosen the cable gland.
• Use the screwdriver to release the contact carrier on both sides.
• Pull the contact carrier from the housing.
• Loosen the screws on the contact carrier, and loosen the wires.
8
12
50
8
12
50
N
3
1 Nm
N
3
1 Nm
CLICK !
CLICK !
30
6,5 Nm
r
min
4 x d
d
4,5 Nm
30
A
B
B
B
A
B