background image

B)

  Connect the conductors to the contact carrier. Match the assign-

ment according to the label on the contact carrier.

WARNING

: Ensure that the correct connection for Line, Neutral, 

Earth match according to the label on the contact carrier. In case 

of mismatch, phase balance of system will be affected.

   

NOTE:

 For flexible wires, we recommend using ferrules acc. to 

DIN 46228 that are crimped with jointing clamp.

C)

  Torque the contact carrier screws to 1 Nm.

D)

  Push the contact carrier into the housing until it snaps in audibly.

E)

  Tighten the cable gland to a torque of 4.5 Nm.

WARNING

: Observe the permitted bending radius during installation. 

The degree of protection might fail if the bend radius is exceeded.

A)

  Prepare the cable:

•  Push the cable gland over the cable.

•  If there are multiple seals, select a seal that fits your cable 

diameter.

•  Push the housing with seal over the cable.

•  Strip 50mm from the cable.

•  Shorten conductors N, L1, L2, and L3 by 8 mm, but keep PE (ground) 

at 50mm.

•  Strip 12mm from the conductors. 

ASSEMBLY

Follow the steps to assemble Enphase Field Wireable QD Connectors for three-phase.

FEMALE

MALE

N

3

Click

Click

Loosening the cable

•  Loosen the cable gland.

•  Use the screwdriver to release the contact carrier on both sides.

•  Pull the contact carrier from the housing.

•  Loosen the screws on the contact carrier, and loosen the wires.

8

12

50

8

12

50

N

3

1 Nm

N

3

1 Nm

CLICK  !

CLICK  !

30

6,5 Nm

r

min

4 x d

d

4,5 Nm

30

A

B

B

B

A

B

Reviews: