- 8 -
2 Installation Instruction
2.1 Product Installation
2.1.1 Package Verification
Unpack to check and verify following items after receiving the charger:
Visual inspection on external appearance. In case there is any broken or damage, notify the seller
immediately.
Check accessory type and quantity. If there is quantity in short or type inconformity, make the record in
time and contact the seller at once.
Accessory List
Quantity
Bracket
1 pcs
Gun holder
1 pcs
Cable holder
1 pcs
Expansion bolt M8x60
(
X
)
4 pcs
Plastic expansion φ6
15pcs
Expansion bolt M4*32
15 pcs
Expansion bolt M5*10
2 pcs
2.1.2 Installation Preparation
1) Tools
Tool Name
Photo
Function
Cross Screwdriver
(PH2x150mm, PH3x250mm)
Tight the screws
Insulated Spanner
Tight the bolts and nuts
Insulated Torque Wrench
Tight the bolts
Combination Wrench
Tight the bolts