![background image](http://html1.mh-extra.com/html/enso/flex-ezz-fe1200/flex-ezz-fe1200_owners-manual_2414230012.webp)
Two people are required to set up the foundation.
NOTE: To avoid damage to the foundation, always open the
carton while the bed is in the flat position.
1. Open the shipping box, cut the ribbon securing accessory
boxes & mattress retainer bar, and put them aside.
Lift the folded bed frame unit out of the shipping carton
carefully, and then put it on a flat floor.
2. To install all six legs (seven for king/CK size,see image A on
page 10) , thread the bolt of the leg to the nut on the
foundation frame, and tighten by hand. DO NOT OVERTIGHTEN.
3. Uncoil the input power cord (connected to the control box’s
power port) and plug it into the power supply.
4. Uncoil the power cord and connect it to the power supply.
Installation Guide
9-22
Summary of Contents for flex EZZ FE1200
Page 2: ......
Page 10: ...FE1200 Electronics Quick Reference Guide 7 22 Control Box Foot Motor Head Motor...
Page 11: ...Foot Motor Power Cord Pairing Button Power Supply Head Motor 8 22...
Page 19: ...16 22...
Page 26: ...NOTES...
Page 27: ......
Page 28: ......