2
Installation instruction
for flat collectors on flat roof or foundation.
The installation instruction applies to collectors:
Flat
collector
Installation
setting
Absorber
type
Absorber
material
*
1
width height
depth
Collector
mass
Surface
Connecting
system
Liquid
content
Optimal
flow min.
- max.
symbol
-
-
-
A
B
C
m
S
-
V
m
unit
-
-
-
mm
mm
mm
kg
m
2
-
dm
3
dm
3
/h
ES2H/2,65
Al-Cu
horizontal
meander
Al-Cu
2356
1120
85
49
2,65
o-ring v.1.
2,20
75 - 105
ES2V/2,65
Al-Cu
vertical
meander
Al-Cu
1120
2356
85
49
2,65
clamp
2,20
75 - 105
ES2V/2,65
vertical
meander
Cu-Cu
1120
2356
85
49
2,65
clamp
2,20
75 - 105
ES2V/2,0
HE
vertical
meander
Cu-Cu
1006
2007
85
38
2,02
clamp
1,80
60 – 90
ES2V/2,0
AL
vertical
meander
Al-Al
1006
2007
85
38
2,02
o-ring v.1.
1,80
40 - 60
EM2V/2,0
Al-Cu
vertical
meander
Al-Cu
1006
1988
85
38
2,0
clamp
1,80
60 - 90
EM2V/2,0
vertical
meander
Cu-Cu
1006
1988
85
38
2,0
clamp
1,80
60 - 90
EM1V/2,0
Al-Cu
vertical
double
harp
Al-Cu
1006
1988
85
40
2,0
clamp
1,80
60 - 90
EM1V/2,0
vertical
double
harp
Cu-Cu
1006
1988
85
40
2,0
clamp
1,80
60 - 90
ES1V/2,0
vertical
double
harp
Cu-Cu
1006
2007
85
40
2,02
clamp
1,80
60 - 90
E-PVT 2,0
v.1
vertical
roll-bond
Al-Al
1006
2007
85
37
2,02
o-ring v.1
1,2
90
*
1
Cu-Cu – high-selective sheet=Cu, hydraulic system=Cu;
Al-Al – high-selective sheet=Al, hydraulic system=Al;
Al-Cu – high-selective sheet=Al, hydraulic system=Cu.