Installation instruction
of the flat solar collectors models ES1V2.0, ES1V2.65,
ES2V/2.0 AL, ES2V/2.65
integrated in the slate roof.
Directions
The nut should be tightened up so as to secure the leak-tightness of the
connection, however, not too strong in order to avoid damage to the
connector pipe of the collector.
4.2.4 Connection of the collectors feeding
1 – connector pipe of the collector
2 – strengthening sleeve
3 – nut
4 – clamping ring
5 – elbow body
6 – insulated flexible conduit
−
place the strengthening sleeve (2) in the connector pipe of the collector (1),
−
elbow nut (3) should be put on the connector pipe of the collector (1),
−
clamping ring (4) should be placed on the connector pipe of the collector (1),
−
screw the nut (3) onto the elbow (5),
−
flexible cord nut (6) needs to be screwed on the elbow (5),
−
connect the flexible conduit to the solar system.
4.2.5 Connection of the collector return
1 – connector pipe of the collector,
2 – strengthening sleeve,
3 – clamp nut,
4 – clamping ring,
5 – complete pipe-cross with a manual air
escape and an immersion sleeve,
6 – insulated flexible conduit
−
place the strengthening sleeve (2) in
the connector pipe of the collector (1),
−
put the clamp nut (3) on the connector pipe of the collector (1),
−
place the clamping ring (4) on the connector pipe of the collector (1),
−
immersion sleeve with the complete pipe-cross (5) needs to be placed in the
connector pipe of the collector (1),
−
screw the clamp nut (3) onto the pipe-cross (5) at the left side,
−
screw the insulated flexible conduit (6) at the bottom of the pipe-cross (5),
−
connect the flexible conduit to the solar system.
4.2.6 Connection of the clamps - for collectors ES2V/2.0 AL, ES2V/2,65
Mount the clamps on the empty connectors (on the diagonal of the collector or the
battery).
1.
Clamp
2.
Solar collector