393803
‐
2
Startup procedure for EnSy AHU units
REV:0_08.09.2016.
KJK
We
reserve
the
right
to
change
technical
data
without
notice
http://www.ensy.no
Page 5
5.
Adjust
to
desired
supply
air
temperature.
Supply
air
temperature
is
set
to
17°C
from
factory
and
can
be
adjusted
between
15
and
21°C.
Press
control
button
2
once
to
get
into
2
Temperature
menu.
Change
values
with
control
buttons
2
(
‐
)
or
3
(+).
After
adjustments
use
control
button
1
(Return)
once
to
get
back
to
the
start
up
menu.
Write
down
set
temperature:
________________
(This
can
of
course
be
changed
by
the
landlord
if
desired)
6.
Setting
time
and
date.
This
is
important
to
get
an
alarm
when
it's
time
for
filter
change.
Press
control
button
4
once
to
get
into
4.
Preferences.
Press
control
button
4
one
more
time
to
get
into
4.1
Time/date
menu.
Change
values
with
control
buttons
2
(
‐
)
or
3
(+).
Press
control
button
4
once
to
get
to
next
step.
If
you
need
to
go
back
and
wants
to
correct
a
field
you
can
start
over
by
pressing
control
button
4
number
of
times
till
you
are
back
in
the
field
you
need
to
change.
Write
down
date:
________________
Press
control
button
3
(
OK
)
once
to
get
back
to
4
Preferences
menu.
Press
control
button
3
twice
to
get
to
Filter.
Press
control
button
4
once
to
get
into
4.3
Filter
menu.
Use
control
buttons
2
(
‐
)
or
3
(+)
to
set
wanted
interval
before
next
filter
change.
Can
be
set
to
6,
9
or
12
months.
Write
down
chosen
interval:
______Months
(This
can
of
course
be
changed
by
the
landlord
if
desired)
Press
control
button
4
once
(Filter
OK!)
and
you
will
get
Next
replace
date
in
display.
Write
down
next
replace
date:
________________
Press
control
button
1
(Return)twice
to
get
back
to
start
up
menu.
Landlord
or,
who
is
responsible
for
service
in
larger
projects,
to
make
an
agreement
for
who
to
change
filters
and
from
whom
to
order
new
filters.
Any
agreements
made,
YES
or
NOI:
____________