Precautions
2-2 Installation Requirements and Guidelines
•
The
S
‐
AC
‐
PS
and
S
‐
POE
‐
PS
power
supplies
require
one
three
‐
pronged
power
receptacle
capable
of
delivering
the
current
and
voltage
specified
in
One
AC
outlet
on
an
independently
fused
circuit
is
required
for
each
power
supply,
and
must
be
located
within
three
meters
(9.84
feet)
of
the
site.
The
power
cord
used
and
type
of
outlet
is
dependent
on
the
country.
In
the
United
States,
one
power
cord
with
a
NEMA
5
‐
20P
plug
is
provided
with
each
power
supply.
•
Ambient
temperature
at
the
installation
site
must
be
maintained
between
5°
and
40°C
(41° to 104°F).
Temperature
changes
must
be
maintained
within
10°C
(18°F)
per
hour.
•
To
keep
your
S8
chassis
running
at
the
proper
temperature,
you
may
have
to
vacuum
any
accumulated
dust
periodically
from
the
vent
holes
on
the
right
side
of
the
S8
chassis.
Precautions
Ensure
that
you
have
read
and
understood
the
installation
and
operation
precautions
before
installing
the
S8
chassis
equipped
with
a
PoE
subsystem.
Warning:
Install the Enterasys S-Series chassis in a Restricted Access Location only. Access to
the equipment by users must be restricted through the use of a tool or lock and key or other means
of security and is controlled by the authority responsible for the location.
Advertencia:
Instalar el chasis Enterasys S en un lugar de Acceso Restringido. Acceso al equipo
debe ser restringido mediante el uso de una herramienta o candado o cualquier otro método de
seguridad y debe ser controlado por el responsable del lugar.
Warnhinweis:
Installieren Sie das S nur in einer zugangsgeschützten Umgebung. Der Bereich zu
den Komponenten sollte durch ein Schloß, einen Schlüssel oder sonstigen Sicherungen geschützt
und durch einen Verantwortlichen kontrolliert werden.
Summary of Contents for S4-Chassis
Page 2: ......
Page 12: ...x...
Page 16: ...xiv...
Page 20: ...Getting Help xviii About This Guide...
Page 28: ...Features 1 8 Introduction...
Page 62: ...Completing the Installation 3 32 Chassis Setup...