Considerations Prior to Installation
3-2 Hardware Installation
Considerations Prior to Installation
When
installing
the
switch,
note
the
following:
•
Before
starting
the
installation
procedure,
notify
the
network
administrator
of
the
installation.
•
Follow
the
installation
procedures
in
the
order
as
presented
in
this
guide.
•
Do
not
connect
the
switch
to
the
network
until
you
have
established
the
correct
IP
address.
Required Tools
A
Phillips
screwdriver
is
required
to
install
the
switch
into
a
rack.
Unpacking the Switch
Unpack
the
switch
as
follows:
1.
Open
the
box
and
remove
the
packing
material
protecting
the
switch.
2.
Verify
that
the
contents
of
the
carton
contains
the
items
listed
in
Table 3
‐
3
.
3.
Remove
the
tape
seal
on
the
non
‐
conductive
bag
to
remove
the
switch.
4.
Perform
a
visual
inspection
of
the
switch
for
any
signs
of
physical
damage.
Contact
Enterasys Networks
if
there
are
any
signs
of
damage.
Refer
to
“
Getting
Help
”
on
page 1
‐
8
for
details.
Table 3-3 Contents of Switch Carton
Item
Quantity
B2G124-48P
or B2H124-48P switch device
1
Rack mounting bracket
2
M3x6-mm flathead screws
8
Rubber feet with adhesive backing for installation on a flat surface
4
AC power cord (The type of power cord is country-dependent.)
1
This installation guide
1
Customer Release Notes
1
URL notice card
1
Summary of Contents for SecureStack B2 B2G124-48P
Page 2: ......
Page 12: ...x ...
Page 21: ...x ...
Page 25: ...xiv ...
Page 29: ...Conventions Used in This Guide xviii About This Guide ...
Page 41: ...1000BASE T Network 2 4 Network Requirements ...
Page 81: ...Using the Reset Switch 4 10 Troubleshooting ...