Using LANVIEW
SecureStack B2 Installation Guide 4-5
UP
Off
No valid connection to switch stack down
connector.
1. Make sure the switch connected to
the stack down connector is
powered on.
2. Replace cable with a known good
one.
3. If the problem still exists, contact
Enterasys Networks for technical
support.
Green
Solid.
Valid connection to switch stack down
connector.
Blinking.
Information is being transferred
through the high-speed stacking cable.
None.
Manager
Off
Switch is operating as a Member in the stack.
None.
Green
Solid.
Switch is operating as the Manager of
the stack.
None.
RPS
Off
Connected C2RPS-POE supply not in use.
Internal power supply failed.
None.
If a C2RPS-POE RPS is connected to
the switch, it should be providing
power. To determine if there is a
problem, perform the following:
1. Ensure the RPS is powered on.
2. Ensure that the AC power cord to
the RPS is plugged in correctly and
that there is power at the AC power
source.
3. Replace the power cord with a
known good one.
4. Ensure the DC power cable
(C2RPS-POE) from the RPS to the
switch is plugged in correctly.
5. If the problem persists, contact
Enterasys Networks for technical
support.
Amber
Solid.
The switch internal power supply failed,
and the RPS is providing the proper power to
the switch.
None.
Table 4-4 LANVIEW LED Diagnostic Indications (continued)
LED
Color
State
Recommended Action
Summary of Contents for SecureStack B2 B2G124-48P
Page 2: ......
Page 12: ...x ...
Page 21: ...x ...
Page 25: ...xiv ...
Page 29: ...Conventions Used in This Guide xviii About This Guide ...
Page 41: ...1000BASE T Network 2 4 Network Requirements ...
Page 81: ...Using the Reset Switch 4 10 Troubleshooting ...