ENVIRO-TEC
11
FORM ET115.24-NOM4 (819)
1
PREFACE
ENVIRO-TEC
fan coils represent a prudent invest-
ment which can, with proper installation, operation,
and regular maintenance, give trouble-free operation
and long service.
Equipment is initially protected under the manufac-
turers’ standard warranty; however, this warranty is
provided under the condition that the steps outlined in
this manual for initial inspection, proper installation,
regular periodic maintenance, and everyday operation
of the equipment be followed in detail. This manual
should be fully reviewed in advance of any actual work
being done on the equipment. Should any questions
arise, please contact your local Sales Representative or
the factory BEFORE proceeding.
The equipment covered by this manual is available
with a vast variety of options and accessories. Consult
the approved unit submittal, order acknowledgement,
and other manuals for details on the options and ac-
cessories provided with the equipment on each project.
UNPACKING & INSPECTION
All units are carefully inspected at the factory through-
out the manufacturing process under a detailed qual-
ity assurance program. All factory furnished major
components and subassemblies are carefully tested for
proper operation and verified to be in full compliance
with the customer order and quality assurance docu-
ments.
Each unit is then carefully packaged for shipment to
avoid damage during normal transport and handling.
The equipment must be stored in a dry place in the
proper orientation as marked on the packaging.
All shipments are made F.O.B. factory and it is the
responsibility of the receiving party to inspect the
equipment upon arrival. Any obvious damage to the
packaging and/or its contents should be recorded on
the bill of lading and a claim should be filed with the
freight carrier.
After determining the condition of the unit’s exterior,
carefully remove each unit from the packaging and in-
spect for hidden damage. At this time, check to make
sure that “ship loose” items such as grilles, decorator
panels, and thermostats are accounted for. Any hidden
damage should be recorded and immediately reported
to the carrier, and a claim filed as before. In the event
a claim for shipping damage is filed, the unit, shipping
package, and all packing must be retained for physical
inspection by the freight carrier. All equipment should
be stored in the factory shipping package with internal
packing in place until installation.
A series of rigorous leak tests are performed on all of
the piping installed in this equipment to ensure piping
integrity. Because this equipment may be shipped with
factory supplied external riser piping, it is necessary
for the receiving inspector to carefully inspect this pip-
ing for signs of shipping damage. If damage is present,
a claim must be filed with the freight carrier
.
At the time of receipt, the equipment type and arrange-
ment should be verified against the order documents.
Should any discrepancy be found, the local Sales Rep-
resentative should be notified immediately so that the
proper action may be instituted. Should any question
arise concerning warranty repairs, the factory must
be notified BEFORE any corrective action is taken.
Where local repairs or alterations can be accomplished,
the factory must be fully informed as to the extent and
expected cost of those repairs before work is begun.
Where factory operations are required, the factory must
be contacted for authorization to return equipment and
a Return Authorization Number will be issued. Unau-
thorized return shipments of equipment and shipments
not marked with an authorization number will be re-
fused. In addition, the manufacturer will not accept any
claims for unauthorized expenses.
SHIP LOOSE ITEMS
Several components are shipped loose for field instal-
lation. These may include: thermostat, return air ac-
cess panel, return air access panel fasteners, discharge
grille(s), risers (optional). These parts are shipped
loose to offer protection against shipping and job-site
damage. Refer to packing slip.
SECTION 1 - RECEIPT & INSTALLATION
Summary of Contents for VHA
Page 10: ...ENVIRO TEC 10 FORM ET115 24 NOM4 819 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 41: ...ENVIRO TEC 41 SECTION 2 START UP FORM ET115 24 NOM4 819 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 54: ...ENVIRO TEC 54 FORM ET115 24 NOM4 819 SECTION 6 Dimensional Data 74 80083 ...
Page 78: ...ENVIRO TEC 78 FORM ET115 24 NOM4 819 SECTION 6 Dimensional Data NOTES ...