FICHE DE MAINTENANCE
Serial n° MONITOR :
OPERATION SHEET 4.3.2
Subject : Checking and replacement of the ejector
FOLIO : 1/1
Frequency : 1 month
Date
See Figure 4–1
– Ejector checking
Switch the analyzer to zero during at least 2 minutes.
Position the manual 3-way valve « Measurement / Zero – Span » into intermediate
position, in order to separate from fluid circuit.
In the « Test / Optical bench » menu, write down the value of the sample pressure: this
value must be equal to 150 +/- 50 hPa when the supply pressure of ejector is equal to
4.10
3
hPa.
– Replacement of the ejector
The temperature inside the chamber is 180°C
.
Open the manifold cover,
Dismount the connecting tube (1) between the chamber and the ejector,
Unscrew the two connectors « Air supply (2) and Vent (3) » located at the upper part of
the ejector,
Unscrew the two screws handling the ejector (4).
I
Figure 4–1 – Checking and replacement of the ejector
Summary of Contents for MIR 9000H
Page 8: ...EnvironnementS A MIR 9000H Duplication prohibited 0 8 APRIL 2011 Page intentionally left blank...
Page 29: ...Duplication prohibited MIR 9000H EnvironnementS A 2 5 APRIL 2011 Page intentionally left blank...
Page 94: ...EnvironnementS A MIR 9000H Duplication prohibited APRIL 2011 4 2 Page intentionally left blank...
Page 97: ...Duplication prohibited MIR 9000H EnvironnementS A APRIL 2011 4 5 Page intentionally left blank...
Page 127: ...Duplication prohibited MIR 9000H EnvironnementS A APRIL 2011 5 11 INCORRECT CORRECT...
Page 142: ...EnvironnementS A MIR 9000H Duplication prohibited APRIL 2011 6 2 Page intentionally left blank...