AFTER INSTALLING THIS UNIT PLEASE PASS ONTO END USER
DO NOT THROW AWAY
22
energiSava 380 installation instructions have been understood
Duct work is Ø150mm with no more than 10% flexi used (90% ridged)
All ducts, vents and diffusers are securely connected & sealed, with supply
and extract filters in place
The unit is securely fixed into position with enough space left for servicing
Condense drain is tight, drains to a suitable location and has been water
tested
On LH Mounted Units - ensure the fan signal connectors located on the
control PCB have been swapped over
All major building works have been completed prior to commissioning
Supply and extract have been commissioned to meet Part F of the Building
Regulations with a calibrated anemometer
Commissioning data has been recorded
Inform building owner/user on how to operate and maintain the system
These checks are required to ensure the proper function of this unit.
For EnviroVent Technical help call 01423 810 810
Checklist to ensure
Guaranteed Installed
Performance
08
Checklist