To be connected by a qualified electrician:
Drill an approx. 10 mm hole in the cabin wall near the entry area of the stove‘s connecting cable.
Feed the connecting cable through the borehole to the outside and connect to the power supply
in a distribution box suitable for wet rooms.
Please observe the wiring diagram and the regulations of the local power supplier (TAB 2000) and
the VDE
.
Caution! An adequate fuse and a mains circuit breaker must be installed in the stove‘s
power cable on site.
Connection example for 400V 3N AC
4,5 kW = 3x 1500 W
6,0 kW = 3x 2000 W
7,5 kW = 3x 2500 W
Power acc. DIN
Electrical connection
Fuse protection
Connecting cable
main - heater
4,5 kW
400 V 3N AC 50 Hz
3 x 16 A
5 x 1,5 mm²
6,0 kW
7,5 kW
All cross sections of a line are minimum diameters in mm² (Copper line).
A1
A2
A3
B1
B2
B3
Thermostat
Sicherheits
temperaturbegrenzer
M
Zeitschaltuhr
timer
Thermostat
overheat safty
shutdown device
reset
A1
A1
B1
B
A
A
M
U V W N N
PE
(Gr)
N
X Y Z
Saunaheizgerät /
sauna heater
poêle de sauna / печь сауны
max. 7,5 kW
rot
grün
green
red
Netz/mains
400 V 3N AC
5x 1,5mm²
max. 10 m
Specifications for default connection 400V 3N AC
!
Caution!
Make sure to connect the neutral wire N.