30
EN
Fig. 6
Terminal box lid
Loosen screws
• Open the terminal box by undoing 2 screws as shown in Fig. 6 and pulling the cover panel
downwards.
Terminal
Counternut
Cable screw connection
Connection box lid
• Check that all clamps are tightened correctly.
• Close the terminal box and the cover again using the two screws. Ensure that the cover panel is
pushed under the edge of the terminal box as far as possible.
Fig. 7
Fig. 5
• Connect the power cable as shown in the wiring diagram.
• There is a wiring diagram attached on the inside of the terminal box.
• Electrical connection shall be made as per Fig. 7 and connection example.
• Attach the enclosed air deflector as shown in Fig. 5. To do this, first release the central screw on
the top cover, then attach the deflector using this and two more tapping screws 4.2 x 9.5 from
the poly bag.
Summary of Contents for Moment W
Page 2: ...2 Deutsch 3 English 21 39...
Page 39: ...39 RU 40 40 41 43 45 45 46 47 47 51 52 53 54 55 56...
Page 40: ...40 RU DIN EN ISO 9001 2015 110 C 30 40 C 110 C 20 25 85 C 80 90 C 76 C...
Page 41: ...41 RU 8 VDE 0100 49 DA 6 VDE 0100 703 2006 2 5 10...
Page 42: ...42 RU DIN EN VDE 0100 T 703 40 170 C...
Page 43: ...43 RU 76 C...
Page 44: ...44 RU...
Page 47: ...47 RU 1 90 90 1 1 2 2 8 cm 33 cm 8 cm 44 cm 8 cm...
Page 48: ...48 RU 4 3 2 3 4 360 430 180 180 Ma e in mm 2 min 120...
Page 49: ...49 RU 6 2 6 7 5 7 5 4 2 x 9 5...
Page 50: ...50 RU 8 6 M4 8 60 cm 22 cm 4 cm...
Page 51: ...51 RU 45 60 40 100 C 15 C 9 4 30 0 0 0 min max 0 1 2 1 1 2 1 2 2 3 1 2 4...
Page 52: ...52 RU 10 STB 10 STB 30...
Page 53: ...53 RU 100 10...
Page 56: ...56 RU ASB I II III IV V VI 24 www eos sauna com agb 08 2018...